Do you need a permit to replace a water heater?
Whether a water heater needs a building permit is decided by the city or county, not by one national rule. Of the 19 large cities whose water heater rule we verified, 14 require a permit and 5 exempt smaller or simpler projects and require a permit above a limit.
On this page
Water Heater permit rules in major cities
Each row is the rule that applies in that city. "Depends" means the city exempts work below a limit; the limit shown is the number in the city's wording, and the conditions that go with it are on the city page.
| City | Permit needed? | Key limit |
|---|---|---|
| New York City, NY | Depends on size or scope1 | Like-for-like replacement exempt? yes1 |
| Los Angeles, CA | Yes2 | Like-for-like replacement exempt? No for owners/ordinary contractors; replacement of a defective water heater with an equivalent one (same gallons, BTU, vent capacity, vent not relocated/replaced) on a detached single-family dwelling by a Certified Licensed Contractor needs a Certificate of Compliance in lieu of a permit2 |
| Chicago, IL | Depends on size or scope3 | Like-for-like replacement exempt? yes3 |
| Phoenix, AZ | Depends on size or scope4 | Like-for-like replacement exempt? yes4 |
| San Antonio, TX | Yes5 | – |
| San Diego, CA | Yes6 | Like-for-like replacement exempt? no6 |
| Dallas, TX | Yes7 | Like-for-like replacement exempt? no7 |
| Jacksonville, FL | Yes8 | Like-for-like replacement exempt? no8 |
| Fort Worth, TX | Yes9 | Like-for-like replacement exempt? no10 |
| San Jose, CA | Yes11 | Like-for-like replacement exempt? no11 |
| Charlotte, NC | Depends on size or scope12 | Like-for-like replacement exempt? yes12 |
| Columbus, OH | Yes13 | Like-for-like replacement exempt? no13 |
| Indianapolis, IN | Depends on size or scope14 | Like-for-like replacement exempt? yes15 |
| San Francisco, CA | Yes16 | – |
| Seattle, WA | Yes17 | – |
| Denver, CO | Yes18 | Like-for-like replacement exempt? no19 |
| Oklahoma City, OK | Yes20 | Like-for-like replacement exempt? no20 |
| Philadelphia, PA | Yes21 | Like-for-like replacement exempt? no22 |
| Austin, TX | Yes23 | – |
Building permit and zoning are separate
A building permit checks how the water heater is built; zoning decides where it can go and how big it can be. In New York City, work that is exempt from a building permit can still need zoning approval:
- New York City.
Any exemptions outlined by this rule will not grant authorization for any…
24
What cities charge for a water heater permit
Fee lines as each city’s schedule states them, never added up into a total; how permit fees work explains valuation formulas and minimums.
| City | Fee | As the schedule states it |
|---|---|---|
| Houston, TX | Plumbing Minimum Permit Fee | $97.5625 |
| Phoenix, AZ | Table A minimum - residential water heaters and fences | $1 - $1,000 $98 Minimum for Residential Water Heaters and Fences*26 |
| San Antonio, TX | Plumbing - Permit Base Fee | Plumbing - Permit Base Fee $57.5027 |
| San Antonio, TX | Water Heater, Vent (gas/electric) | Water Heater, Vent (gas/electric) $9.2027 |
| Jacksonville, FL | Residential plumbing fixture (incl. hot water tanks), each | including hot water tanks or boosters, and washing machines with sewer connection, for each roughing-in and fixture or plugged outlet (fee for new roughing-in includes fixture) · $11.0028 |
| Jacksonville, FL | Minimum plumbing permit fee | Minimum fee for a plumbing permit, based upon the fee formulas contained above · $60.0028 |
| Fort Worth, TX | 1. Permit Application Fee, Applicable to All Permit Types, Excluding Signs | 1. Permit Application Fee, Applicable to All Permit Types, Excluding Signs: 33.0829 |
| Fort Worth, TX | 3. Technology Fee applicable to all applications/ permits | 3. Technology Fee applicable to all applications/ permits: 16.8729 |
| Fort Worth, TX | 2. Reinspection fee | 2. Reinspection fee: 66.1529 |
| Charlotte, NC | Appliance/Equipment Change Out (water heaters, HVAC, kitchen appliances) via Trades Internet Permit (TIP) | 1.5 x the minimum permit fee (both trade permits combined) via TIP; 2 x the maximum permit fee by other means30 |
| Columbus, OH | Minor Work Permit - Electrical, Mechanical, or Plumbing only (1, 2, and 3 Family) | Minor Work Permit - Electrical, Mechanical, or Plumbing only. Must be on the Approved Minor Work Permit List (includes 1 inspection) $14031 |
| Seattle, WA | Plumbing/Backflow Permit (Public Health – Seattle & King County) | $137 plus $27 per Fixture32 |
| Seattle, WA | Gas Piping/Medical Gas Permit (Public Health – Seattle & King County) | $137 plus $27 per Outlet32 |
| Denver, CO | Building permit fee, valuation $1.00 to $500.00 | $1.00 to $500.00 $20.00 033 |
| Denver, CO | Building permit fee, valuation $501.00 to $2,000.00 | $501.00 to $2,000.00 $35.00 033 |
| Denver, CO | Building permit fee, valuation $2,001.00 to $25,000.00 | $2,001.00 to $25,000.00 $35.00 for the first $2,000.00 plus $8.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 50%33 |
| Oklahoma City, OK | Gasfitting, replacement of residential appliance or fixture, each | Each appliance or fixture, bathroom wall heater, floor furnace - gas, appliance over 40k Btu, unit heater - wall, vented water · $26.50 · $50.00 · 60-29-2034 |
| Nashville, TN | Plumbing permit minimum fee | Minimum fee (each permit) ... $75.0035 |
| Nashville, TN | Plumbing: hot water heater | Hot water heater ... $43.0035 |
| Nashville, TN | Gas/mechanical: hot water heater | Hot water heater ... $21.0035 |
| El Paso, TX | Plumbing: Base fee, ea. (non-refundable) | $110 plus applicable technology fee36 |
| El Paso, TX | Plumbing: electric water heater (and other listed fixtures), ea. | $10.59 based on quantity plus base fee and applicable technology fee36 |
| El Paso, TX | Gas: Base fee, ea. (non-refundable) | $110 plus applicable technology fee36 |
| Las Vegas, NV | Water Heater | 26 Water Heater $0 $2237 |
| Boston, MA | Plumbing | $20.00 Primary fee plus $5.00 each fixture.38 |
| Boston, MA | Gas appliances | $20, plus $5 per meter.39 |
| Boston, MA | Gas boilers, heaters, furnaces, industrial ovens | $20, plus $50 each, plus $0.09 per 1,000 BTU.39 |
| Detroit, MI | Plumbing installation permit application fee | Application Fee (Non-Refundable) Flat $7340 |
| Detroit, MI | Plumbing fixtures/appliances, each | Plumbing Fixtures, Plumbing Appliance, Plumbing Appurtenance, Plus Any Other Fixture, Drain, Water Connected Appliance or Appurtenance Not specifically Listed Each $4440 |
| Memphis, TN | Plumbing issuance | PERMIT ISSUANCE $20.0041 |
| Memphis, TN | Electric water heater replacement | P-1.1 ELECTRIC WATER HEATER REPLACEMENT $7.5041 |
| Memphis, TN | Gas water heater, first $1,000 | G-3.1.3 WATER HEATER FIRST $1000 $15.0041 |
| Baltimore, MD | Fuel-burning equipment, 0 to 200,000 BTU/h per unit | 0 to 200,000 $3042 |
| Baltimore, MD | Electrical water heaters | Electrical water heaters, new construction or replacement $20 each42 |
| Milwaukee, WI | Electrical: water heater (electrical) | yf. Water heater (electrical): $25.43 |
| Milwaukee, WI | Plumbing: each fixture or appliance | i. Installation and connection of each plumbing fixture or appliance: $20.44 |
| Tucson, AZ | Trade Permits (single item, incl. water heater, HVAC, panel, sewer line) | $150.0045 |
| Fresno, CA | Permit Issuance - All projects (administrative base fee, MPE stand-alone) | Permit Issuance - All projects 27.0846 |
| Fresno, CA | Simple M,P,E single or combination permits | SIMPLE M,P,E SINGLE OR COMBINATION PERMITS 111.5046 |
| Fresno, CA | Water Heater (simple plumbing item) | Water Heater 111.5046 |
| Sacramento, CA | Water heater (new installation, replacement or move) (flat building permit fee) | Water heater (new installation, replacement or move) $75 N/A47 |
| Raleigh, NC | Minimum Trade Permit Fee | Any fee not specifically listed as an individual fee will be charged at the minimum permit fee. This also applies to a minimum building plan review fee. Which are assessed as per trade per review. $123.00 $124.00 Per Trade48 |
| Colorado Springs, CO | Water Heater Replacement | Water Heater Replacement $40.0049 |
| Colorado Springs, CO | Water Heater, Furnace, or Boiler Replacement, including vent | Water Heater, Furnace, or Boiler Replacement, including vent $75.0049 |
| Virginia Beach, VA | Gas permit | $50 plus $4 per outlet/shutoff50 |
| Virginia Beach, VA | Mechanical permit | $50 plus $5 per $1,000 of the construction value50 |
| Virginia Beach, VA | Plumbing permit | $50 plus $6 per fixture/drain50 |
| Long Beach, CA | Plumbing Permit Issuance Fee | Plumbing Permit Issuance Fee $104 / permit51 |
| Oakland, CA | Rapid Permit Filing Fee | d. Rapid Permit Filing Fee · 67.16 Per Permit52 |
| Oakland, CA | Residential - Plumbing - R3 - Inspection | 6. Residential - Plumbing - R3 - Inspection · 4.7952 |
| Oakland, CA | Water Heater (Gas or Electric) and/or Storage Tank | 4. · Water Heater (Gas or Electric) and/or Storage Tank · 201.48 Each52 |
| Minneapolis, MN | Plumbing permit minimum fee - Residential & Commercial | Minimum Fee - Residential & Commercial $85.20 (Includes $1.00 State Surcharge)53 |
| Arlington, TX | Electrical base permit fee (not associated with building permit) | Base permit fee $100.0054 |
| Arlington, TX | Plumbing: Water heater, first water heater | Water heater, first water heater $20.0054 |
| Aurora, CO | Flat rate: egress window, gas pipe, residential EV charger, residential siding, water heater replacement | $99 EACH • Egress Window Installation • Gas Pipe Installation or Modification • Residential EV Charger • Residential Siding Replacement • Water Heater Replacement55 |
| Aurora, CO | Flat rate: tankless water heater | $287 EACH • Tankless Water Heater55 |
| Aurora, CO | Flat rate: furnace and water heater replacement | $292 • Furnace and Water Heater Replacement55 |
| Austin, TX | Residential Change - Out Program Permits - HVAC - Each additional system | $20.6956 |
| Austin, TX | Inspections for Standalone Projects | $73.8156 |
Before you start
Find your city’s water heater rule with the permit checker. What to check before you buy materials (city limits, limits in the rule, zoning and HOA rules) and the order of the steps are in how to get a building permit; what an exemption does not cover is in work exempt from a permit.
Sources
- 2022 NYC Construction Codes, General Administrative Provisions (Admin. Code Title 28), Chapter 1 AdministrationCity of New York, Department of BuildingsChecked November 7, 2026
- LAMC Ch. IX Art. 4 (Los Angeles Plumbing Code), Sec. 94.103.0 Permits and InspectionsCity of Los Angeles (Los Angeles Municipal Code, hosted by American Legal Publishing)Checked November 6, 2026
- What Types of Work Do Not Require a Building Permit? (Full List)City of Chicago, Department of BuildingsChecked November 7, 2026
- 2024 International Building Code Administrative Provisions (IBC Chapter 1), Phoenix amendmentsCity of Phoenix, Planning & Development DepartmentEffective August 1, 2025Checked November 7, 2026
- Home Remodeling FAQCity of San Antonio, Development Services DepartmentPublished August 1, 2019Checked November 6, 2026
- SDMC Chapter 12, Article 9, Division 4: Plumbing/Mechanical Permit ProceduresCity of San Diego, San Diego Municipal Code (docs.sandiego.gov, Office of the City Clerk)Revised May 2020Checked November 7, 2026
- Chapter 52: Administrative Procedures for the Construction Codes (City of Dallas booklet, current through April 23,…City of Dallas, Planning & Development DepartmentLast updated April 23, 2025Checked November 7, 2026
- Frequently Asked QuestionsCity of Jacksonville (consolidated City of Jacksonville/Duval County), Public Works Department, Building Inspection DivisionChecked November 7, 2026
- Residential PermittingCity of Fort Worth, Development Services DepartmentChecked November 7, 2026
- Fort Worth Administrative Building Code, Ordinance No. 25387-03-2022City of Fort Worth, Development Services DepartmentAdopted March 8, 2022Checked November 7, 2026
- Water HeatersCity of San José, Development Services Permit Center (PBCE)Last updated April 14, 2026Checked November 7, 2026
- Frank Cappelli Stop Work Order OSFM Decision (appeal under G.S. 160D-1114)North Carolina Office of State Fire Marshal (OSFM), Engineering and Building Codes DivisionPublished September 30, 2026Checked November 7, 2026
- Typical Residential ProjectsCity of Columbus, Department of Building and Zoning ServicesRevised March 2026Checked November 7, 2026
- Residential Development PermitsCity of Indianapolis, Department of Business and Neighborhood ServicesChecked November 6, 2026
- 2016 Building Standards and Procedures of the Consolidated City of Indianapolis (Chapter 536 etc.)City of Indianapolis, Department of Business and Neighborhood ServicesEffective January 1, 2018Checked November 7, 2026
- Apply for a plumbing and mechanical permitCity and County of San Francisco, Department of Building InspectionChecked November 7, 2026
- 2021 Seattle Plumbing CodeCity of Seattle, Seattle Department of Construction & InspectionsChecked November 6, 2026
- Building Permit Policy ADMIN 125 and 138: Building and Related FeesCity and County of Denver, Community Planning and DevelopmentRevised May 21, 2024Checked November 7, 2026
- 2025 Denver Building Code (2nd Printing, November 2025)City and County of Denver, Community Planning and DevelopmentPublished November 2025Checked November 7, 2026
- Development CenterCity of Oklahoma City, Development Services Department, Development CenterChecked November 7, 2026
- Get a Plumbing PermitCity of Philadelphia, Department of Licenses and InspectionsChecked November 7, 2026
- EZ Permit Standard: Plumbing (PB_030_F)City of Philadelphia, Department of Licenses and InspectionsPublished 2026Checked November 7, 2026
- Residential Change-Out Permit Application (One- and Two-Family Occupied Dwellings Only)City of Austin, Austin Development ServicesRevised July 7, 2020Checked November 7, 2026
- 1 RCNY §101-14 Categories of work that may or may not require a permitCity of New York, Department of BuildingsChecked November 7, 2026
- City Fee ScheduleCity of Houston, Finance Department (City-Wide Fee Schedule)Effective January 1, 2026Checked November 7, 2026
- PDD Fee Schedule, Phoenix City Code Chapter 9, Appendix A.2City of Phoenix, Planning & Development DepartmentEffective January 20, 2026Checked November 7, 2026
- FY 2027 Development Fee ScheduleCity of San Antonio, Development Services DepartmentRevised October 2026Checked November 7, 2026
- City Fees (Categorized by Departments)City of Jacksonville, City Fees page (Building Inspection Division - Section 320.409)Checked November 7, 2026
- Ordinance No. 26-28781City of Fort Worth, Development Services DepartmentEffective October 1, 2026Checked November 7, 2026
- Mecklenburg County Government Fee Ordinance, Land Use and Environmental Services (revised July 1, 2026)Mecklenburg County Board of County Commissioners / Land Use and Environmental Services Agency (LUESA)Revised July 1, 2026Checked November 7, 2026
- 2026 Combined Development Related Fee ScheduleCity of Columbus, Department of Building and Zoning ServicesPublished 2026Checked November 7, 2026
- Plumbing and Gas Piping Program fees (through 2026)Public Health – Seattle & King County (King County)Effective January 1, 2026Checked November 7, 2026
- Building and Land Development Fees - City and County of DenverCity and County of Denver, Community Planning and DevelopmentChecked November 7, 2026
- Development Services Fee Changes (Fees Changing July 1, 2025)City of Oklahoma City, Development Services Department, Development CenterEffective July 1, 2025Checked November 7, 2026
- Codes Fee Schedule (Building-Permit-Fee-Scheudle-2025.pdf)Metropolitan Government of Nashville and Davidson County, Department of Codes and Building SafetyPosted December 2025Checked November 7, 2026
- City of El Paso FY2026-2027 Adopted Budget, FY 2027 Schedule C Departmental Fee ListCity of El Paso, Office of Management & BudgetAdopted August 18, 2026Checked November 7, 2026
- City of Las Vegas 2020 Building User Fees (Building & Fee Table)City of Las Vegas, Department of Community Development, Building & Safety DivisionEffective July 1, 2021Checked November 7, 2026
- Building Fees 5 15 23 (ISD fee schedule)City of Boston, Inspectional Services DepartmentChecked November 7, 2026
- Gas PermitCity of Boston, Inspectional Services DepartmentLast updated September 11, 2026Checked November 7, 2026
- City of Detroit BSEED Fee Schedule, Effective January 1, 2024, Modified 7/18/2025City of Detroit, Buildings, Safety Engineering and Environmental Department (BSEED)Revised July 18, 2025Checked November 7, 2026
- 2022 Fee Schedule, Building Section FeesMemphis and Shelby County Office of Construction Code EnforcementPublished 2022Checked November 8, 2026
- Section 109. Fees (Building Code)City of Baltimore Law Library (Department of Legislative Reference)Checked November 7, 2026
- A substitute ordinance relating to increasing various fees for permits, licenses, certificates, inspections and…City of Milwaukee, Common CouncilEffective January 1, 2026Checked November 7, 2026
- Milwaukee Code of Ordinances ch. 200, subchapter 5 (Fees)City of Milwaukee, Department of Neighborhood ServicesRevised November 8, 2024Checked November 8, 2026
- Planning and Permitting Fee Schedule (Adopted Year 1 Fee Schedule, FY27)City of Tucson, Planning & Development Services Department (PDSD)Effective July 1, 2026Checked November 7, 2026
- City of Fresno Master Fee Schedule - Planning & Development Fees (effective 07/01/2026)City of Fresno, Planning and Development DepartmentEffective July 1, 2026Checked November 7, 2026
- Building Division Fee Detail: Table A (valuation) and Table B.1 (flat fee building permits)City of Sacramento (Fees and Charges database, Community Development Department)Revised July 19, 2025Checked November 7, 2026
- Development Fee Guide July 1, 2026 - June 30, 2027City of Raleigh, Planning and DevelopmentEffective July 1, 2026Checked November 7, 2026
- Fee Schedule - Pikes Peak Regional Building Department (Appendix B: Fee Schedule, 2023 PPRBC)Pikes Peak Regional Building Department (PPRBD)Effective June 30, 2025Checked November 7, 2026
- Trades Permits | City of Virginia BeachCity of Virginia Beach, Planning & Community Development, Permits & Inspections DivisionChecked November 7, 2026
- Plumbing Permit & Plan Review FeesCity of Long Beach, Community Development Department, Building and Safety BureauEffective October 1, 2026Checked November 7, 2026
- Fiscal Year 2026-27 Master Fee ScheduleCity of Oakland (Master Fee Schedule, Planning & Building Department section)Effective July 1, 2026Checked November 7, 2026
- Minneapolis Plumbing Fee ScheduleCity of Minneapolis, Community Planning & Economic Development (CPED), Construction Code Services / Minneapolis Development ReviewChecked November 7, 2026
- City of Arlington Planning and Development Services Fee Schedule, Effective October 1, 2026 (Resolution No. 26-288)City of Arlington, Planning & Development ServicesEffective October 1, 2026Checked November 7, 2026
- 2026 Flat Rate Fee Permits (Flat-Rate Fee, Revised 08/2026, Form #A175)City of Aurora, Development Services Department, Building DivisionRevised August 2026Checked November 7, 2026
- City of Austin Fee Schedule | Residential Building Plan Review & Inspection Permit FeesCity of Austin, Austin Development ServicesEffective October 1, 2026Checked November 7, 2026