Milwaukee building permits
Building permits in Milwaukee are issued by the Department of Neighborhood Services (DNS), Permit and Development Center1. You can apply and request inspections online through aca-prod.accela.com2.
On this page
- Building department contacts
- Building codes in force in Milwaukee
- Milwaukee building permit fees
- How to get a building permit in Milwaukee
- Permit expiration and extensions
- Inspections in Milwaukee
- Building without a permit in Milwaukee
- Doing the work yourself (owner-builder)
- Wisconsin rules that also apply in Milwaukee
- Sources
Building department contacts
Department of Neighborhood Services (DNS), Permit and Development Center1
Building permits
- Website
- city.milwaukee.gov2
- Apply online
- aca-prod.accela.com2
- Phone
- (414) 286-82102
- [email protected]3
- Address
- 809 N. Broadway, 1st Floor, Milwaukee, WI 532022
- Hours
- Mon, Tue, Thu, Fri 8:00 AM-4:30 PM; Wed no appointments, open 8:00 AM-4:30 PM for drop off, pick up and payment2
- Inspections
- Call your inspector directly; Construction Section 414-286-2513 if unknown. LMS also lists online scheduling.4
Department of Neighborhood Services (zoning referrals at the Permit and Development Center); Board of Zoning Appeals hears appeals2
Zoning and planning
- Website
- city.milwaukee.gov5
- Phone
- (414) 286-25015
Historic Preservation Commission (HPC), City Clerk's Office8
Historic preservation
- Phone
- (414) 286-57128
- Address
- Zeidler Municipal Building, 841 N. Broadway, Room B-1, Milwaukee, WI 532028
City Clerk, License Division (City of Milwaukee Home Improvement Contractor License)10
Contractor licensing
- Phone
- (414) 286-223810
To look up permits already issued for an address (useful before you buy, or to check a contractor's work), use the city's official permit search: aca-prod.accela.com7.
Building codes in force in Milwaukee
These are the model codes Milwaukee enforces, with the edition and the date it took effect. Plans are reviewed and work is inspected against them. For the state framework, see Wisconsin building codes.
| Code | Title as adopted | Model edition | Effective | Adopted by |
|---|---|---|---|---|
| State code | Wisconsin Uniform Dwelling Code (UDC), Wis. Admin. Code chs. SPS 320-32511 | – | – | Wisconsin Department of Safety and Professional Services, with the Uniform Dwelling Code Council advising12 |
| Energy code, residential | Chapter SPS 322 - Energy Conservation12 | 200911 | 11 | Wisconsin Department of Safety and Professional Services11 |
| International Building Code (IBC) | International Building Code 202113 | 202113 | – | Wisconsin Department of Safety and Professional Services (administrative rule, chs. SPS 361-366)14 |
| International Existing Building Code (IEBC) | International Existing Building Code 202113 | 202113 | – | Wisconsin Department of Safety and Professional Services (administrative rule, chs. SPS 361-366)14 |
| International Mechanical Code (IMC) | International Mechanical Code 202113 | 202113 | – | Wisconsin Department of Safety and Professional Services (administrative rule, chs. SPS 361-366)14 |
| International Fuel Gas Code (IFGC) | International Fuel Gas Code 202113 | 202113 | – | Wisconsin Department of Safety and Professional Services (administrative rule, chs. SPS 361-366)14 |
| Energy code, commercial | International Energy Conservation Code 202113 | 202113 | – | Wisconsin Department of Safety and Professional Services (administrative rule, chs. SPS 361-366)14 |
| International Fire Code (IFC) | Portions of the International Fire Code 202113 | 202113 | – | Wisconsin Department of Safety and Professional Services (administrative rule, chs. SPS 361-366)14 |
| National Electrical Code (NEC) | Wisconsin Electrical Code (SPS 316)15 | – | 16 | – |
| State code | Wisconsin Plumbing Code, Wis. Admin. Code chs. SPS 381-38717 | – | 17 | Wisconsin Department of Safety and Professional Services (Clearinghouse Rule CR 26-019)17 |
Transition rules. IBC, IEBC, IMC, IFGC, Energy code (commercial) and IFC: Plans submitted on or after November 1, 2025 must comply13. NEC: Licensing exams reflect the new code from October 1, 202616.
Milwaukee building permit fees
Fees come from the Plan Review and Permit Fee Schedules (Permit & Development Center), summarizing Milwaukee Code of Ordinances chs. 81 and 200; the ordinances govern18, effective 19.
How valuation is set. Cost of materials and labor, excluding HVAC, electrical, plumbing, furniture, equipment and decorating20.
Each line is worded as in Milwaukee’s schedule; formulas are not added up into a total (how permit fees work).
| Fee | Type | As the schedule states it |
|---|---|---|
| Alterations, remodeling and repairs | Based on project valuation | The fee for all alterations, remodeling, repairs and repairing fire damage to all buildings, structures and equipment shall be computed at 1.6% of the cost of construction.21 |
| Alterations, 1- and 2-family minimum | Minimum fee | b-1. The minimum fee for one- and 2-family dwellings and accessory structures shall be $150.21 |
| Processing charge (building permits) | Flat fee | There shall be a processing fee of $20 for each alteration or repair.21 |
| Dwellings, new construction and additions | Per square foot | b-1. The fee for all one- and 2-family dwellings shall be computed at $0.55 per square foot, using the definition set forth in s. 200-08-86.2.21 |
| Dwellings, new construction and additions, minimum | Minimum fee | 2. The minimum fee shall be $200.21 |
| Garages and accessory structures over 150 sq ft | Per square foot | c-1. The fee for garages and other structures of more than 150 square feet in area accessory to one- and 2-family dwellings shall be computed at $0.45 per square foot of area.21 |
| Sheds and accessory structures up to 150 sq ft | Flat fee | c-2. The fee for sheds and other structures accessory to one- and 2-family dwellings and not more than 150 square feet in area shall be $175.21 |
| Fence construction | Flat fee | a. There shall be a $25 fee for the construction of fences.21 |
| Fence processing | Flat fee | b. There shall be a processing fee of $35 for each fence construction permit issued.21 |
| Razing or demolishing a building | – | a. The permit fee for the razing or demolishing of any building or structure shall be $55 plus $0.005 per cubic foot of the volume of the building.21 |
| Interior demolition | – | b. The permit fee for interior demolition of any building or structure shall be computed at 2% of the cost of demolition. The minimum fee shall be $75.21 |
| Training and technology surcharge | Technology surcharge | There shall be a training and technology surcharge of 1.6% on each permit fee, plan examination fee, inspection fee, fee for service, and any other fee charged by the department of neighborhood services, with exceptions determined by the commissioner.21 |
| Plan examination, 1- and 2-family | Plan review | The minimum fee for new construction and additions shall be $175.21 |
| Plan review, garage | Plan review | The plan review fee for a garage shall be $75.21 |
| Plan review, shed or deck | Plan review | The plan review fee for a shed or deck shall be $50.21 |
| Energy code review, 1- and 2-family | Plan review | b. Energy Code. The fee for compliance with the state energy code for one-and 2-family dwellings shall be $65.21 |
| Electrical: service up to 400 amps | Flat fee | y-1. Up to 400 amps: $130.19 |
| Electrical: water heater (electrical) | Flat fee | yf. Water heater (electrical): $25.19 |
| Electrical: hot tub or swimming pool | Flat fee | m. Hot tub or swimming pool: $110.19 |
| Electrical: processing | Flat fee | yr. There shall be a processing fee of $25 for each electrical installation or repair permit issued.19 |
| Plumbing: each fixture or appliance | Per fixture or item | i. Installation and connection of each plumbing fixture or appliance: $20.21 |
| Plumbing: minimum permit fee | Minimum fee | The minimum permit fee shall be $85.21 |
| Plumbing: processing | Flat fee | o. There shall be a processing fee of $20 for each plumbing permit issued.21 |
| HVAC: heating unit additional BTU | – | a-1. Heating, incinerator units and wood-burning appliances: $55 per unit not exceeding 150,000 BTUs of input. For each additional 50,000 BTUs or fraction thereof, an additional fee of $25 shall be charged.19 |
| HVAC: air conditioning unit | – | a-3. Air conditioning and refrigeration units: $60 per unit not exceeding 3 tons. For each additional ton or fraction thereof, an additional fee of $10 shall be charged.19 |
| Permit renewal | – | The fee for renewal of a permit is 1% of the cost of the remaining construction work.22 |
Lines from Common Council File 250865 are shown as enacted: the ordinance strikes the old amount and inserts the new one, and only the new amount is shown. The ordinance reads “This ordinance is effective January 1, 2026.”
How to get a building permit in Milwaukee
- Check whether the work needs a permit6
- Submit plans for plan examination where required20
- Pay plan review and permit fees18
- Post the permit at the front of the premises23
- Request required inspections at each stage24
- Notify DNS on completion23
- Apply online
- Yes, through the Land Management System (LMS)7
- Over-the-counter permits
- Permits not requiring plan review are available during all business hours2
- Posting the permit
- Board sign at least 7.5 by 6 inches at the front of the premises23
Permit expiration and extensions
- How long a permit lasts
- Expires 2 years from issuance (3 years over 100,000 sq ft)23
- Extensions
- Ask the district inspector before expiration7
Inspections in Milwaukee
Milwaukee’s inspection stages, in order. Do not cover work until the stage has passed (how inspections work).
- Footing and foundation inspections prior to backfill9
- Rough framing inspections prior to insulating or covering9
- Insulation and vapor barrier inspections prior to wall finish9
- Final inspections prior to occupying space9
- Electrical inspection25
- Plumbing inspection26
- How to schedule
- Call your inspector directly; if unknown, call 286-25134
- Re-inspection fee
- Reinspection after an order: a. To compensate for inspectional and administrative costs, a fee of $250 may be charged for any reinspection to determine compliance with an order to correct conditions of provisions of the code under the jurisdiction of the department of neighborhood services or assigned to the department, except no fee shall be charged for the reinspection when compliance is recorded.21
- After the final inspection
- Approvals recorded on the permit sticker24
Building without a permit in Milwaukee
| Consequence | Applies to | As the city states it |
|---|---|---|
| Higher permit fee MCO s. 200-32-3-a | Work started or premises occupied without a required permit23 | Fees may be quadrupled18 |
| Daily fine MCO s. 200-19-1 | Owner, operator or occupant in violation of the code, or anyone building contrary to approved plans24 | $150 per violation per day to $5,000 per premises, plus costs24 |
| Removal order | Unpermitted work on homes7 | Work may be subject to removal7 |
| Permit revoked MCO s. 200-31-1 | Permits, certificates and approvals on violation or danger23 | Commissioner may revoke and stop construction23 |
| Lien or recorded notice MCO s. 200-33-48-a | Unpaid reinspection fees21 | Reinspection fees become a lien on delinquency21 |
For how unpermitted work is usually legalized, see how to legalize unpermitted work.
Doing the work yourself (owner-builder)
- Homeowner may pull a building permit
- Yes, if they occupy the property and it is not rented7
- Homeowner plumbing work
- Yes in an owner-occupied single family home only7
- Owner and occupancy requirement
- Must occupy; home not rented7
- Affidavit or declaration
- Signed cautionary statement (owner acknowledges they reside or will reside in the dwelling)3
Wisconsin's statewide owner-builder and licensing rules are on the Wisconsin permit guide.
Wisconsin rules that also apply in Milwaukee
Sources
- Department of Neighborhood ServicesCity of Milwaukee, Department of Neighborhood ServicesChecked November 8, 2026
- Permits - Department of Neighborhood ServicesCity of Milwaukee, Department of Neighborhood ServicesChecked November 8, 2026
- Cautionary StatementCity of Milwaukee, Department of Neighborhood ServicesLast updated September 4, 2026Checked November 8, 2026
- Construction Inspection ProcessCity of Milwaukee, Department of Neighborhood ServicesChecked November 7, 2026
- Board of Zoning AppealsCity of Milwaukee, Board of Zoning AppealsChecked November 8, 2026
- Does It Need a Permit?City of Milwaukee, Department of Neighborhood ServicesChecked November 8, 2026
- Resources for HomeownersCity of Milwaukee, Department of Neighborhood ServicesChecked November 8, 2026
- Historic Preservation CommissionCity of Milwaukee, Historic Preservation CommissionChecked November 8, 2026
- Construction InspectionCity of Milwaukee, Department of Neighborhood ServicesChecked November 7, 2026
- Credential information for Homeowners & LandlordsCity of Milwaukee, Department of Neighborhood ServicesRevised December 16, 2021Checked November 8, 2026
- UDC (Uniform Dwelling Code / One- and Two- Family Dwellings) - DSPSWisconsin Department of Safety and Professional Services, Division of Industry ServicesChecked November 6, 2026
- Statutes & Codes | Uniform Dwelling Code CouncilWisconsin Department of Safety and Professional Services, Division of Industry ServicesChecked November 6, 2026
- Division of Industry Services Quarterly Newsletter, Fall 2025Wisconsin Department of Safety and Professional Services, Division of Industry ServicesPublished 2025Checked November 6, 2026
- Commercial Buildings, HVAC, and EnergyWisconsin Department of Safety and Professional Services, Division of Industry ServicesChecked November 6, 2026
- ElectricalWisconsin Department of Safety and Professional Services, Division of Industry ServicesChecked November 6, 2026
- Division of Industry Services Quarterly Newsletter, Summer 2026Wisconsin Department of Safety and Professional Services, Division of Industry ServicesPublished 2026Checked November 6, 2026
- DSPS - DIS Fall Newsletter (Fall 2026)Wisconsin Department of Safety and Professional Services, Division of Industry ServicesPosted September 28, 2026Checked November 6, 2026
- Plan Review and Permit FeesCity of Milwaukee, Department of Neighborhood ServicesLast updated March 6, 2026Checked November 7, 2026
- A substitute ordinance relating to increasing various fees for permits, licenses, certificates, inspections and…City of Milwaukee, Common CouncilEffective January 1, 2026Checked November 7, 2026
- Remodeling Projects - One- and Two-Family HomesCity of Milwaukee, Department of Neighborhood ServicesRevised September 9, 2020Checked November 8, 2026
- Milwaukee Code of Ordinances ch. 200, subchapter 5 (Fees)City of Milwaukee, Department of Neighborhood ServicesRevised November 8, 2024Checked November 8, 2026
- Renewing a Building PermitCity of Milwaukee, Department of Neighborhood ServicesRevised September 11, 2020Checked November 8, 2026
- Milwaukee Code of Ordinances ch. 200 subch. 4 PermitsCity of Milwaukee, Code of Ordinances (City Clerk, Legislative Reference Bureau)Revised December 18, 2018Checked November 8, 2026
- Milwaukee Code of Ordinances ch. 200 subch. 3 EnforcementCity of Milwaukee, Code of Ordinances (City Clerk, Legislative Reference Bureau)Revised February 6, 2024Checked November 8, 2026
- Electrical InspectionCity of Milwaukee, Department of Neighborhood ServicesChecked November 7, 2026
- Plumbing InspectionCity of Milwaukee, Department of Neighborhood ServicesChecked November 7, 2026