Not a government site. Always confirm with your local building department before you build. About us

Building Permit Requirements
Menu

Milwaukee building permits

Building permits in Milwaukee are issued by the Department of Neighborhood Services (DNS), Permit and Development Center1. You can apply and request inspections online through aca-prod.accela.com2.

Last checked

On this page
  1. Building department contacts
  2. Building codes in force in Milwaukee
  3. Milwaukee building permit fees
  4. How to get a building permit in Milwaukee
  5. Permit expiration and extensions
  6. Inspections in Milwaukee
  7. Building without a permit in Milwaukee
  8. Doing the work yourself (owner-builder)
  9. Wisconsin rules that also apply in Milwaukee
  10. Sources

Building department contacts

Department of Neighborhood Services (DNS), Permit and Development Center1

Building permits

Address
809 N. Broadway, 1st Floor, Milwaukee, WI 53202
2
Hours
Mon, Tue, Thu, Fri 8:00 AM-4:30 PM; Wed no appointments, open 8:00 AM-4:30 PM for drop off, pick up and payment2
Inspections
Call your inspector directly; Construction Section 414-286-2513 if unknown. LMS also lists online scheduling.4

Department of Neighborhood Services (zoning referrals at the Permit and Development Center); Board of Zoning Appeals hears appeals2

Zoning and planning

Department of Public Works (DPW)7

Public works and right-of-way

Historic Preservation Commission (HPC), City Clerk's Office8

Historic preservation

Address
Zeidler Municipal Building, 841 N. Broadway, Room B-1, Milwaukee, WI 53202
8

DNS Construction Section (work without a permit complaints)9

Code enforcement

City Clerk, License Division (City of Milwaukee Home Improvement Contractor License)10

Contractor licensing

To look up permits already issued for an address (useful before you buy, or to check a contractor's work), use the city's official permit search: aca-prod.accela.com7.

Building codes in force in Milwaukee

These are the model codes Milwaukee enforces, with the edition and the date it took effect. Plans are reviewed and work is inspected against them. For the state framework, see Wisconsin building codes.

CodeTitle as adoptedModel editionEffectiveAdopted by
State codeWisconsin Uniform Dwelling Code (UDC), Wis. Admin. Code chs. SPS 320-32511––Wisconsin Department of Safety and Professional Services, with the Uniform Dwelling Code Council advising12
Energy code, residentialChapter SPS 322 - Energy Conservation1220091111Wisconsin Department of Safety and Professional Services11
International Building Code (IBC)International Building Code 202113202113–Wisconsin Department of Safety and Professional Services (administrative rule, chs. SPS 361-366)14
International Existing Building Code (IEBC)International Existing Building Code 202113202113–Wisconsin Department of Safety and Professional Services (administrative rule, chs. SPS 361-366)14
International Mechanical Code (IMC)International Mechanical Code 202113202113–Wisconsin Department of Safety and Professional Services (administrative rule, chs. SPS 361-366)14
International Fuel Gas Code (IFGC)International Fuel Gas Code 202113202113–Wisconsin Department of Safety and Professional Services (administrative rule, chs. SPS 361-366)14
Energy code, commercialInternational Energy Conservation Code 202113202113–Wisconsin Department of Safety and Professional Services (administrative rule, chs. SPS 361-366)14
International Fire Code (IFC)Portions of the International Fire Code 202113202113–Wisconsin Department of Safety and Professional Services (administrative rule, chs. SPS 361-366)14
National Electrical Code (NEC)Wisconsin Electrical Code (SPS 316)15–16–
State codeWisconsin Plumbing Code, Wis. Admin. Code chs. SPS 381-38717–17Wisconsin Department of Safety and Professional Services (Clearinghouse Rule CR 26-019)17

Transition rules. IBC, IEBC, IMC, IFGC, Energy code (commercial) and IFC: Plans submitted on or after November 1, 2025 must comply13. NEC: Licensing exams reflect the new code from October 1, 202616.

Milwaukee building permit fees

Fees come from the Plan Review and Permit Fee Schedules (Permit & Development Center), summarizing Milwaukee Code of Ordinances chs. 81 and 200; the ordinances govern18, effective 19.

How valuation is set. Cost of materials and labor, excluding HVAC, electrical, plumbing, furniture, equipment and decorating20.

Each line is worded as in Milwaukee’s schedule; formulas are not added up into a total (how permit fees work).

FeeTypeAs the schedule states it
Alterations, remodeling and repairsBased on project valuationThe fee for all alterations, remodeling, repairs and repairing fire damage to all buildings, structures and equipment shall be computed at 1.6% of the cost of construction.21
Alterations, 1- and 2-family minimumMinimum feeb-1. The minimum fee for one- and 2-family dwellings and accessory structures shall be $150.21
Processing charge (building permits)Flat feeThere shall be a processing fee of $20 for each alteration or repair.21
Dwellings, new construction and additionsPer square footb-1. The fee for all one- and 2-family dwellings shall be computed at $0.55 per square foot, using the definition set forth in s. 200-08-86.2.21
Dwellings, new construction and additions, minimumMinimum fee2. The minimum fee shall be $200.21
Garages and accessory structures over 150 sq ftPer square footc-1. The fee for garages and other structures of more than 150 square feet in area accessory to one- and 2-family dwellings shall be computed at $0.45 per square foot of area.21
Sheds and accessory structures up to 150 sq ftFlat feec-2. The fee for sheds and other structures accessory to one- and 2-family dwellings and not more than 150 square feet in area shall be $175.21
Fence constructionFlat feea. There shall be a $25 fee for the construction of fences.21
Fence processingFlat feeb. There shall be a processing fee of $35 for each fence construction permit issued.21
Razing or demolishing a building–a. The permit fee for the razing or demolishing of any building or structure shall be $55 plus $0.005 per cubic foot of the volume of the building.21
Interior demolition–b. The permit fee for interior demolition of any building or structure shall be computed at 2% of the cost of demolition. The minimum fee shall be $75.21
Training and technology surchargeTechnology surchargeThere shall be a training and technology surcharge of 1.6% on each permit fee, plan examination fee, inspection fee, fee for service, and any other fee charged by the department of neighborhood services, with exceptions determined by the commissioner.21
Plan examination, 1- and 2-familyPlan reviewThe minimum fee for new construction and additions shall be $175.21
Plan review, garagePlan reviewThe plan review fee for a garage shall be $75.21
Plan review, shed or deckPlan reviewThe plan review fee for a shed or deck shall be $50.21
Energy code review, 1- and 2-familyPlan reviewb. Energy Code. The fee for compliance with the state energy code for one-and 2-family dwellings shall be $65.21
Electrical: service up to 400 ampsFlat feey-1. Up to 400 amps: $130.19
Electrical: water heater (electrical)Flat feeyf. Water heater (electrical): $25.19
Electrical: hot tub or swimming poolFlat feem. Hot tub or swimming pool: $110.19
Electrical: processingFlat feeyr. There shall be a processing fee of $25 for each electrical installation or repair permit issued.19
Plumbing: each fixture or appliancePer fixture or itemi. Installation and connection of each plumbing fixture or appliance: $20.21
Plumbing: minimum permit feeMinimum feeThe minimum permit fee shall be $85.21
Plumbing: processingFlat feeo. There shall be a processing fee of $20 for each plumbing permit issued.21
HVAC: heating unit additional BTU–a-1. Heating, incinerator units and wood-burning appliances: $55 per unit not exceeding 150,000 BTUs of input. For each additional 50,000 BTUs or fraction thereof, an additional fee of $25 shall be charged.19
HVAC: air conditioning unit–a-3. Air conditioning and refrigeration units: $60 per unit not exceeding 3 tons. For each additional ton or fraction thereof, an additional fee of $10 shall be charged.19
Permit renewal–The fee for renewal of a permit is 1% of the cost of the remaining construction work.22

Lines from Common Council File 250865 are shown as enacted: the ordinance strikes the old amount and inserts the new one, and only the new amount is shown. The ordinance reads “This ordinance is effective January 1, 2026.”

How to get a building permit in Milwaukee

  1. Check whether the work needs a permit6
  2. Submit plans for plan examination where required20
  3. Pay plan review and permit fees18
  4. Post the permit at the front of the premises23
  5. Request required inspections at each stage24
  6. Notify DNS on completion23
Apply online
Yes, through the Land Management System (LMS)7
Over-the-counter permits
Permits not requiring plan review are available during all business hours2
Posting the permit
Board sign at least 7.5 by 6 inches at the front of the premises23

Permit expiration and extensions

How long a permit lasts
Expires 2 years from issuance (3 years over 100,000 sq ft)23
Extensions
Ask the district inspector before expiration7

Inspections in Milwaukee

Milwaukee’s inspection stages, in order. Do not cover work until the stage has passed (how inspections work).

  1. Footing and foundation inspections prior to backfill9
  2. Rough framing inspections prior to insulating or covering9
  3. Insulation and vapor barrier inspections prior to wall finish9
  4. Final inspections prior to occupying space9
  5. Electrical inspection25
  6. Plumbing inspection26
How to schedule
Call your inspector directly; if unknown, call 286-25134
Re-inspection fee
Reinspection after an order: a. To compensate for inspectional and administrative costs, a fee of $250 may be charged for any reinspection to determine compliance with an order to correct conditions of provisions of the code under the jurisdiction of the department of neighborhood services or assigned to the department, except no fee shall be charged for the reinspection when compliance is recorded.21
After the final inspection
Approvals recorded on the permit sticker24

Building without a permit in Milwaukee

ConsequenceApplies toAs the city states it
Higher permit fee MCO s. 200-32-3-aWork started or premises occupied without a required permit23Fees may be quadrupled18
Daily fine MCO s. 200-19-1Owner, operator or occupant in violation of the code, or anyone building contrary to approved plans24$150 per violation per day to $5,000 per premises, plus costs24
Removal orderUnpermitted work on homes7Work may be subject to removal7
Permit revoked MCO s. 200-31-1Permits, certificates and approvals on violation or danger23Commissioner may revoke and stop construction23
Lien or recorded notice MCO s. 200-33-48-aUnpaid reinspection fees21Reinspection fees become a lien on delinquency21

For how unpermitted work is usually legalized, see how to legalize unpermitted work.

Doing the work yourself (owner-builder)

Homeowner may pull a building permit
Yes, if they occupy the property and it is not rented7
Homeowner plumbing work
Yes in an owner-occupied single family home only7
Owner and occupancy requirement
Must occupy; home not rented7
Affidavit or declaration
Signed cautionary statement (owner acknowledges they reside or will reside in the dwelling)3

Wisconsin's statewide owner-builder and licensing rules are on the Wisconsin permit guide.

Wisconsin rules that also apply in Milwaukee

Sources

  1. Department of Neighborhood ServicesCity of Milwaukee, Department of Neighborhood ServicesChecked November 8, 2026
  2. Permits - Department of Neighborhood ServicesCity of Milwaukee, Department of Neighborhood ServicesChecked November 8, 2026
  3. Cautionary StatementCity of Milwaukee, Department of Neighborhood ServicesLast updated September 4, 2026Checked November 8, 2026
  4. Construction Inspection ProcessCity of Milwaukee, Department of Neighborhood ServicesChecked November 7, 2026
  5. Board of Zoning AppealsCity of Milwaukee, Board of Zoning AppealsChecked November 8, 2026
  6. Does It Need a Permit?City of Milwaukee, Department of Neighborhood ServicesChecked November 8, 2026
  7. Resources for HomeownersCity of Milwaukee, Department of Neighborhood ServicesChecked November 8, 2026
  8. Historic Preservation CommissionCity of Milwaukee, Historic Preservation CommissionChecked November 8, 2026
  9. Construction InspectionCity of Milwaukee, Department of Neighborhood ServicesChecked November 7, 2026
  10. Credential information for Homeowners & LandlordsCity of Milwaukee, Department of Neighborhood ServicesRevised December 16, 2021Checked November 8, 2026
  11. UDC (Uniform Dwelling Code / One- and Two- Family Dwellings) - DSPSWisconsin Department of Safety and Professional Services, Division of Industry ServicesChecked November 6, 2026
  12. Statutes & Codes | Uniform Dwelling Code CouncilWisconsin Department of Safety and Professional Services, Division of Industry ServicesChecked November 6, 2026
  13. Division of Industry Services Quarterly Newsletter, Fall 2025Wisconsin Department of Safety and Professional Services, Division of Industry ServicesPublished 2025Checked November 6, 2026
  14. Commercial Buildings, HVAC, and EnergyWisconsin Department of Safety and Professional Services, Division of Industry ServicesChecked November 6, 2026
  15. ElectricalWisconsin Department of Safety and Professional Services, Division of Industry ServicesChecked November 6, 2026
  16. Division of Industry Services Quarterly Newsletter, Summer 2026Wisconsin Department of Safety and Professional Services, Division of Industry ServicesPublished 2026Checked November 6, 2026
  17. DSPS - DIS Fall Newsletter (Fall 2026)Wisconsin Department of Safety and Professional Services, Division of Industry ServicesPosted September 28, 2026Checked November 6, 2026
  18. Plan Review and Permit FeesCity of Milwaukee, Department of Neighborhood ServicesLast updated March 6, 2026Checked November 7, 2026
  19. A substitute ordinance relating to increasing various fees for permits, licenses, certificates, inspections and…City of Milwaukee, Common CouncilEffective January 1, 2026Checked November 7, 2026
  20. Remodeling Projects - One- and Two-Family HomesCity of Milwaukee, Department of Neighborhood ServicesRevised September 9, 2020Checked November 8, 2026
  21. Milwaukee Code of Ordinances ch. 200, subchapter 5 (Fees)City of Milwaukee, Department of Neighborhood ServicesRevised November 8, 2024Checked November 8, 2026
  22. Renewing a Building PermitCity of Milwaukee, Department of Neighborhood ServicesRevised September 11, 2020Checked November 8, 2026
  23. Milwaukee Code of Ordinances ch. 200 subch. 4 PermitsCity of Milwaukee, Code of Ordinances (City Clerk, Legislative Reference Bureau)Revised December 18, 2018Checked November 8, 2026
  24. Milwaukee Code of Ordinances ch. 200 subch. 3 EnforcementCity of Milwaukee, Code of Ordinances (City Clerk, Legislative Reference Bureau)Revised February 6, 2024Checked November 8, 2026
  25. Electrical InspectionCity of Milwaukee, Department of Neighborhood ServicesChecked November 7, 2026
  26. Plumbing InspectionCity of Milwaukee, Department of Neighborhood ServicesChecked November 7, 2026