Do you need a permit for a solar panel system?

Permits for solar panel systems are set locally: the city or county building department decides, under the code it has adopted. Below are the official rules and fees we verified, in each department's own words.

Last checked

On this page
  1. State laws on solar permitting
  2. What cities charge for a solar panel system permit
  3. Before you start
  4. Sources

State laws on solar permitting

7 states in our records have a statute on this. Each entry quotes the statute; the state page has the rest.

Arizona A.R.S. § 9-468; § 11-323

  • A municipality shall not require a stamp from a professional engineer for a solar photovoltaic system unless an engineering stamp is deemed necessary.1
  • A fee or charge shall not exceed the actual cost of issuing a permit, and a written, itemized list of the individual costs associated with the permit fee shall be provided at the request of the permittee.1
  • Any building or permit fee or charge assessed by a county for a building permit for solar construction must be attributable to and defray or cover the expense of the service for which the fee or charge is assessed.2

California Cal. Gov. Code § 65850.5

  • Statewide concern, applies to local rules. The implementation of consistent statewide standards to achieve the timely and cost-effective installation of solar energy systems is not a municipal affair, as that term is used in Section 5 of Article XI of the California Constitution, but is instead a matter of statewide concern.3
  • Every local agency must have expedited rooftop solar process. On or before September 30, 2015, every city, county, or city and county, in consultation with the local fire department or district and the utility director, if the city, county, or city and county operates a utility, shall adopt an ordinance, consistent with the goals and intent of subdivision (a), that creates an expedited, streamlined permitting process for small residential rooftop solar energy systems.3
  • One inspection. For a small residential rooftop solar energy system eligible for expedited review, only one inspection shall be required, which shall be done in a timely manner and may include a consolidated inspection, except that a separate fire safety inspection may be performed in a city, county, or city and county that does not have an agreement with a local fire authority to conduct a fire safety inspection on behalf of the fire authority.3
  • A solar energy system that is no larger than 10 kilowatts alternating current nameplate rating or 30 kilowatts thermal.3

Colorado C.R.S. §§ 30-28-113(1)(b)(II), 31-15-602(4)(b); 3 CCR 710-1 Rule 1.9.A.2

  • County cap: lesser of actual cost or $500 residential, $1,000 nonresidential. Except as otherwise provided in this section, the aggregate of all charges or other related or associated fees a county shall impose or assess to install an active solar energy system or geothermal energy system shall not exceed the lesser of the county's actual costs in issuing the permit or five hundred dollars for a residential application or one thousand dollars for a nonresidential application if the device or system produces fewer than two megawatts of direct current electricity or an equivalent-sized thermal energy system, or that exceed the county's actual costs in issuing the permit if the device or system produces at least two megawatts of direct current electricity or an equivalent-sized thermal energy system.4
  • Effective December 31, 2029. This subsection (1)(b)(II) is repealed, effective December 31, 2029.4
  • Municipal cap: lesser of actual cost or $500 residential, $1,000 nonresidential. Except as otherwise provided in this section, the aggregate of all charges or other related or associated fees a municipality shall impose or assess to install an active solar [...] electric or solar thermal device or system or a geothermal energy system shall not exceed the lesser of the municipality's actual costs in issuing the permit or five hundred dollars for a residential application or one thousand dollars for a nonresidential application if the device or system produces fewer than two megawatts of direct current electricity or an equivalent-sized thermal energy system, or that exceed the municipality's actual costs in issuing the permit if the device or system produces at least two megawatts of direct current electricity or an equivalent- sized thermal energy system.5
  • Effective December 31, 2029. This subsection (4)(b) is repealed, effective December 31, 2029.5

Maryland Md. Code, Local Government § 1-1320, as amended by Chapter 353 of 2026 (HB 1532)

  • Counties and municipalities must implement solar permitting software by August 1, 2027. Subject to subsection (d) of this section and except as provided in subsection (e) of this section, on or before August 1, 2027, each county and municipality shall implement solar permitting software for features supporting the application submission, tracking, and approval of residential building permits for…7
  • State energy agency page says August 1, 2027. The adoption of SolarAPP+ (or another automated permitting tool) satisfies the requirement in Maryland law to adopt software to automate the permit and plan review process for residential solar and energy storage systems by August 1, 2027.8
  • HB 1104 of 2026 would have moved the date to 2027; its page last shows a March hearing. In the House - Hearing 3/03 at 1:00 p.m.9
  • Chapter 353 of 2026 changed the deadline from August 1, 2025 to August 1, 2027. Subject to subsection (d) of this section and except as provided in subsection (e) of this section, on or before August 1, [2025] 2027, each county and municipality shall implement solar permitting software for features supporting the [tracking] APPLICATION SUBMISSION, TRACKING, and approval of residential building permits for…10

Minnesota Minn. R. 1300.0120; DLI solar PV fact sheet (Revised February 2022)

  • Building permit where a municipality enforces the code. A building permit is required for all solar PV installations where the State Building Code is enforced by a municipality.11
  • Electrical permit also required. Electrical permits are also required for solar PV systems.11
  • Roof penetration for solar counts as residential roofing skill. …penetration of roof coverings for purposes of attaching a solar photovoltaic system.12
  • Solar support system assembly is an installation skill. …assembly of the support system for a solar photovoltaic system.12

Missouri RSMo §§ 442.012, 442.404

  • Covenants cannot bar rooftop solar. No deed restrictions, covenants, or similar binding agreements running with the land shall limit or prohibit, or have the effect of limiting or prohibiting, the installation of solar panels or solar collectors on the rooftop of any property or structure.13
  • HOAs may adopt limited placement rules. A homeowners' association may adopt reasonable rules, subject to any applicable statutes or ordinances, regarding the placement of solar panels or solar collectors to the extent that those rules do not prevent the installation of the device, impair the functioning of the device, restrict the use of the device, or adversely affect the cost or efficiency of the device.13
  • Solar use is a property right. The right to utilize solar energy is a property right but eminent domain may not be used to obtain such property right.13

New Mexico NMSA 1978, § 60-13-10.2; 14.5.2.8(F) NMAC

  • Uniform solar permit procedure by rule. As provided in the Solar Collector Standards Act [71-6-4 to 71-6-10 NMSA 1978], the division and commission shall promulgate rules to establish a uniform procedure for the issuance of permits for the construction and installation of solar collectors and to identify the trade bureau having jurisdiction over the construction and installation of solar collectors.14
  • Electrical permit issued to a licensed electrical contractor. Submittal documents shall be prepared and submitted to the appropriate electrical AHJ for review and approval pursuant to Subsection K of 14.5.2.10 NMAC. The submittal documents shall consist of, at a minimum, the following documentation and upon approval an electrical permit shall be issued to a New Mexico electrical contractor properly licensed for the specific solar PV installation…15
  • PV on your own house. Yes. Electrical plan review, permit, and inspection are required.16

What cities charge for a solar panel system permit

Fee lines as each city’s schedule states them, never added up into a total; how permit fees work explains valuation formulas and minimums.

CityFeeAs the schedule states it
New York City, NYPermit for electrical workAs provided by department rules.17
Phoenix, AZResidential solar PV fixed fee, Option C (no plan review)3) Option C – No Plan Review … $488 Administrative Fee and 2- inspections18
Denver, COSolar panel or photovoltaic project$50 flat fee19
Oklahoma City, OKPhotovoltaic system (building)Photovoltaic system · $0.00 · $76.80 · $86.40 · $96.00 · 60-12-10 (i)20
Oklahoma City, OKElectrical: photovoltaic installations (solar)Photovoltaic installations (solar). · $0.00 · $96.00 · $108.00 · $120.00 · 60-18-26 (h)20
Nashville, TNElectrical permit minimum fee11. Minimum fee (each permit) ... $75.0021
El Paso, TXBuilding Permits: Solar Shingle per 100 sq. ft.$14 per sq. ft. plus base fee plus applicable technology fee22
El Paso, TXElectrical Permits: Base fee, ea. (non-refundable)$110 plus applicable technology fee22
El Paso, TXElectrical Permits: Solar panels, ea.$14 based on quantity plus base fee and applicable technology fee22
Las Vegas, NVPhotovoltaic system (up to 10 kW in base fee)49 Photovoltaic system - 3 power apparatus (up to 10 kW included in base fee) $102 $25923
Las Vegas, NVPhotovoltaic - each additional 10 kW50 Each additional 10 kW $60 $5323
Detroit, MIElectrical permit base feeELECTRICAL PART A Base fee Base $6624
Detroit, MISolar PV with utility grid connection, per inverter connectionSystems with utility grid connection per inverter connection Per visit $27824
Baltimore, MDPhotovoltaic system1 to 25 photovoltaic panels $25 For each additional 10 or fraction of 10 panels $525
Tucson, AZSolar Permits – Photovoltaic Electrical Systems – 1 to 30 PV panels$122.4626
Fresno, CAPhotovoltaic Systems - Residential, first 15kWFirst 15kW 170.37 162.8527
Long Beach, CAPhotovoltaic (Rooftop) Residential 0-10 kilowatts0-10 kilowatts $22728
Oakland, CASolarApp+ Filing Feec. SolarApp+ Filing Fee · 21.49 Per Permit29
Oakland, CARapid Permit Filing Feed. Rapid Permit Filing Fee · 67.16 Per Permit29
Oakland, CASolar Electric - Residential1. · Residential · 450.00 Inspection29
Arlington, TXResidential: Solar PanelSolar Panel* $325.0030
Arlington, TXResidential: Home Backup Power Installations (third-party plan review and inspections)Home Backup Power Installations (for third-party plan review and inspections) $300.0030
Aurora, COFlat rate: energy storage system$191 • Energy Storage System31
Aurora, COFlat rate: residential solar PV system$500 • Residential Solar PV System31
Philadelphia, PAElectrical WorkElectrical Work $25 for each $1,000 or fraction thereof of estimated electrical construction costs.32

Before you start

Find your city’s solar panel system rule with the permit checker. What to check before you buy materials (city limits, limits in the rule, zoning and HOA rules) and the order of the steps are in how to get a building permit; what an exemption does not cover is in work exempt from a permit.

Sources

  1. 9-468 - Solar construction permits; standards; definitionArizona State Legislature, Arizona Revised StatutesChecked November 5, 2026
  2. 11-323 - Solar construction permits; standards; definitionArizona State Legislature, Arizona Revised StatutesChecked November 5, 2026
  3. Government Code Section 65850.5California Legislature, Legislative Information (leginfo) public data downloadEffective January 1, 2020Checked November 5, 2026
  4. C.R.S. Title 30 (counties), selected sectionsColorado General Assembly (Colorado Revised Statutes 2024, published on the legislature's site)Published 2024Checked November 5, 2026
  5. C.R.S. Title 31 (municipalities), selected sectionsColorado General Assembly (Colorado Revised Statutes 2024, published on the legislature's site)Published 2024Checked November 5, 2026
  6. State Electrical Board Rules and RegulationsColorado Department of Regulatory Agencies, State Electrical BoardEffective September 22, 2026Checked November 7, 2026
  7. Md. Code, Local Government § 1-1320Maryland General Assembly, Annotated Code of MarylandChecked November 7, 2026
  8. Maryland SolarAPP+ Implementation Grant ProgramMaryland Energy AdministrationPublished July 1, 2026Checked November 5, 2026
  9. House Bill 1104, 2026 Regular SessionMaryland General AssemblyChecked November 5, 2026
  10. Chapter 353 (House Bill 1532), Utility RELIEF (Reducing Energy Load Inflation for Everyday Families) ActMaryland General Assembly, Annotated Code of MarylandAdopted May 12, 2026Checked November 5, 2026
  11. Solar photovoltaic systems and the 2020 MN Residential CodeMinnesota Department of Labor and IndustryRevised February 2022Checked November 5, 2026
  12. Minn. Stat. § 326B.802 DefinitionsMinnesota Office of the Revisor of Statutes, Minnesota StatutesPublished 2026Checked November 5, 2026
  13. RSMo Section 442.404Missouri General Assembly, Revisor of StatutesEffective August 28, 2024Checked November 6, 2026
  14. Chapter 60, Article 13 NMSA 1978, Construction Industries Licensing ActNew Mexico Compilation Commission, NMOneSource (NMSA 1978 Unannotated)Last updated November 4, 2026Checked November 7, 2026
  15. 14.5.2 NMAC PermitsNew Mexico Administrative Code (State Records Center and Archives)Revised July 14, 2023Checked November 7, 2026
  16. Frequently Asked QuestionsNew Mexico Regulation and Licensing Department, Construction Industries DivisionChecked November 7, 2026
  17. 2022 NYC Construction Codes, General Administrative Provisions (Admin. Code Title 28), Chapter 1 AdministrationCity of New York, Department of BuildingsChecked November 7, 2026
  18. PDD Fee Schedule, Phoenix City Code Chapter 9, Appendix A.2City of Phoenix, Planning & Development DepartmentEffective January 20, 2026Checked November 7, 2026
  19. Building and Land Development Fees - City and County of DenverCity and County of Denver, Community Planning and DevelopmentChecked November 7, 2026
  20. Development Services Fee Changes (Fees Changing July 1, 2025)City of Oklahoma City, Development Services Department, Development CenterEffective July 1, 2025Checked November 7, 2026
  21. Codes Fee Schedule (Building-Permit-Fee-Scheudle-2025.pdf)Metropolitan Government of Nashville and Davidson County, Department of Codes and Building SafetyPosted December 2025Checked November 7, 2026
  22. City of El Paso FY2026-2027 Adopted Budget, FY 2027 Schedule C Departmental Fee ListCity of El Paso, Office of Management & BudgetAdopted August 18, 2026Checked November 7, 2026
  23. City of Las Vegas 2020 Building User Fees (Building & Fee Table)City of Las Vegas, Department of Community Development, Building & Safety DivisionEffective July 1, 2021Checked November 7, 2026
  24. City of Detroit BSEED Fee Schedule, Effective January 1, 2024, Modified 7/18/2025City of Detroit, Buildings, Safety Engineering and Environmental Department (BSEED)Revised July 18, 2025Checked November 7, 2026
  25. Section 109. Fees (Building Code)City of Baltimore Law Library (Department of Legislative Reference)Checked November 7, 2026
  26. Planning and Permitting Fee Schedule (Adopted Year 1 Fee Schedule, FY27)City of Tucson, Planning & Development Services Department (PDSD)Effective July 1, 2026Checked November 7, 2026
  27. City of Fresno Master Fee Schedule - Planning & Development Fees (effective 07/01/2026)City of Fresno, Planning and Development DepartmentEffective July 1, 2026Checked November 7, 2026
  28. Electrical Permit & Plan Review FeesCity of Long Beach, Community Development Department, Building and Safety BureauEffective October 1, 2026Checked November 7, 2026
  29. Fiscal Year 2026-27 Master Fee ScheduleCity of Oakland (Master Fee Schedule, Planning & Building Department section)Effective July 1, 2026Checked November 7, 2026
  30. City of Arlington Planning and Development Services Fee Schedule, Effective October 1, 2026 (Resolution No. 26-288)City of Arlington, Planning & Development ServicesEffective October 1, 2026Checked November 7, 2026
  31. 2026 Flat Rate Fee Permits (Flat-Rate Fee, Revised 08/2026, Form #A175)City of Aurora, Development Services Department, Building DivisionRevised August 2026Checked November 7, 2026
  32. PG_012_INF Construction Permit Fees (Rev 7.2026), Effective October 1, 2026City of Philadelphia, Department of Licenses and InspectionsRevised July 2026Checked November 7, 2026