Not a government site. Always confirm with your local building department before you build. About us

Building Permit Requirements
Menu

Colorado Springs building permits

Building permits in Colorado Springs are issued by the Pikes Peak Regional Building Department (PPRBD)1. You can apply and request inspections online through pprbd.org2.

Last checked

On this page
  1. Building department contacts
  2. Building codes in force in Colorado Springs
  3. Colorado Springs building permit fees
  4. How to get a building permit in Colorado Springs
  5. Permit expiration and extensions
  6. Inspections in Colorado Springs
  7. Building without a permit in Colorado Springs
  8. Doing the work yourself (owner-builder)
  9. Colorado rules that also apply in Colorado Springs
  10. Sources

Building department contacts

Pikes Peak Regional Building Department (PPRBD)1

Building permits

Website
pprbd.org3
Apply online
pprbd.org2
Address
2880 International Circle, Colorado Springs, CO 80910 (Main Office); 3939 Cordera Crest Avenue, Colorado Springs, CO 80924 (North Office)
4
Hours
Permits: 7:30am - 4:15pm; Plan Review by appointment only; inspector office hours 7:30am - 8:30am4
Inspections
Phone, in person, or online (homeowner account); same-day inspection if scheduled by 8:29 am5

City of Colorado Springs Planning Department6

Zoning and planning

Address
30 S. Nevada Ave., Suite 701, Colorado Springs, CO 80903
6

PPRBD Regional Floodplain Management Office3

Floodplain

Hours
By appointment only4

PPRBD Contractor Licensing3

Contractor licensing

To look up permits already issued for an address (useful before you buy, or to check a contractor's work), use the city's official permit search: pprbd.org1.

Building codes in force in Colorado Springs

These are the model codes Colorado Springs enforces, with the edition and the date it took effect. Plans are reviewed and work is inspected against them. For the state framework, see Colorado building codes.

CodeTitle as adoptedModel editionEffective
International Building Code (IBC)2023 Pikes Peak Regional Building Code (adopts 2021 IBC by reference)7202178
International Residential Code (IRC)2023 Pikes Peak Regional Building Code (adopts 2021 IRC by reference)7202178
International Mechanical Code (IMC)2023 Pikes Peak Regional Building Code (adopts 2021 IMC by reference)7202178
International Fuel Gas Code (IFGC)2023 Pikes Peak Regional Building Code (adopts 2021 IFGC by reference)7202178
International Plumbing Code (IPC)2023 Pikes Peak Regional Building Code (adopts 2021 IPC by reference)7202178
National Electrical Code (NEC)2023 Pikes Peak Regional Building Code (adopts 2023 NEC by reference)7202378
Energy code, residential2023 Pikes Peak Regional Building Code (adopts 2021 IECC by reference)7202178
Energy code, commercial2023 Pikes Peak Regional Building Code (adopts 2021 IECC by reference)7202178
International Existing Building Code (IEBC)2023 Pikes Peak Regional Building Code (adopts 2021 IEBC by reference)7202178
Swimming Pool and Spa Code (ISPSC)2023 Pikes Peak Regional Building Code (adopts 2021 ISPSC by reference)7202178

Adopted by: City Council of Colorado Springs, Ordinance 23-16 (passed March 28, 2023)7.

Transition rules. Implementation date June 30, 20237.

Colorado Springs building permit fees

Fees come from Appendix B: Fee Schedule, 2023 Pikes Peak Regional Building Code9, effective 9.

How valuation is set. ICC Building Valuation Data x Regional Modifier9.

Each line is worded as in Colorado Springs’s schedule; formulas are not added up into a total (how permit fees work).

FeeTypeAs the schedule states it
Table A building permit fee (row $1 to $500)Based on project valuation$1 to $500 $50.009
Table A building permit fee (row $501 to)Based on project valuation$501 to $2,000 $50.00 for the first $500 plus $2.00 for each additional $100 or fraction thereof, to and including $2,0009
Table A building permit fee (row $2,001 to)Based on project valuation$2,001 to $25,000 $80.00 for the first $2,000 plus $8.00 for each additional $1,000 or fraction thereof, to and including $25,0009
Table A building permit fee (row $25,001 to)Based on project valuation$25,001 to $50,000 $264.00 for the first $25,000 plus $8.00 for each additional $1,000 or fraction thereof, to and including $50,0009
Table A building permit fee (row $50,001 to)Based on project valuation$50,001 to $100,000 $464.00 for the first $50,000 plus $5.00 for each additional $1,000 or fraction thereof, to and including $100,0009
Table A building permit fee (row $100,001 to)Based on project valuation$100,001 to $500,000 $714.00 for the first $100,000 plus $4.00 for each additional $1,000 or fraction thereof, to and including $500,0009
Table A building permit fee (row $500,001 to)Based on project valuation$500,001 to $1,000,000 $2,314.00 for the first $500,000 plus $3.50 for each additional $1,000 or fraction thereof, to and including $1,000,0009
Table A building permit fee (row $1,000,000 and more)Based on project valuation$1,000,000 and more $4,064.00 for the first $1,000,000 plus $3.00 for each additional $1,000 or fraction thereof9
Table C trade permit fee not associated with a building permit (row 1)Based on project valuation$100 to $500 $50.009
Table C trade permit fee not associated with a building permit (row 2)Based on project valuation$501 to $2,000 $50.00 for the first $500 plus $5.50 for each additional $100 or fraction thereof, up to and including $2,0009
Table C trade permit fee not associated with a building permit (row 3)Based on project valuation$2,001 to $5,000 $132.50 for the first $2,000 plus $1.45 for each additional $100 or fraction thereof, up to and including $5,0009
Table C trade permit fee not associated with a building permit (row 4)Based on project valuation$5,001 to $50,000 $176.00 for the first $5,000 plus $6.75 for each additional $1,000 or fraction thereof, up to and including $50,0009
Table C trade permit fee not associated with a building permit (row 5)Based on project valuation$50,001 and more $480.00 for the first $50,000 plus $4.50 for each additional $1,000 or fraction thereof9
Asphalt Shingle Reroof (existing one- and two-family dwellings and townhomes)Flat feeAsphalt Shingle Reroof $135.009
StuccoFlat feeStucco $135.009
Wood / Composite SidingFlat feeWood / Composite Siding $115.009
Basement FinishFlat feeBasement Finish $300.009
Trade attachment fee, detached accessory structure or alteration of one- and two-family dwellingsFlat feedetached accessory structure or alteration(s) of one- and two-family dwellings. PERMIT ATTACHMENT FEE $50.00 for each trade9
Water Heater ReplacementFlat feeWater Heater Replacement $40.009
Water Heater, Furnace, or Boiler Replacement, including ventFlat feeWater Heater, Furnace, or Boiler Replacement, including vent $75.009
Gas Log or Fireplace Insert InstallationFlat feeGas Log or Fireplace Insert Installation $40.009
Air Conditioning Condensing Unit ReplacementFlat feeAir Conditioning Condensing Unit Replacement $30.009
Air Conditioning Installation (coil and condenser); Furnace; Wall/Space Heater; or Boiler ReplacementFlat feeAir Conditioning Installation (coil and condenser); Furnace; Wall/Space Heater; or Boiler Replacement $50.009
Wrecking Permit FeeFlat feeWrecking Permit Fee $30.009
Manufactured Home PermitFlat feeManufactured Home Permit $240.009
Plan Examination FeePlan review28% of Building Permit Fee9
Inspection outside of normal business hoursAfter-hours inspectionInspection outside of normal business hours (Minimum charge two hours) $100.00/Hour9
Re-inspection FeesRe-inspection$50.00 for 1st incident $100.00 for 2nd incident $200.00 for 3rd incident, plus 2 work day inspection delay9
Investigation Fee: Work without a PermitWork started without a permitEqual to two times the Permit Fee9
Floodplain permit, up to 1,500 sq ft disturbed areaFlat feeUP TO 1,500 $50.009

To apply Colorado Springs's valuation table to your own project value, use the permit fee calculator; it shows the schedule line it used.

How to get a building permit in Colorado Springs

  1. Check whether the project needs a permit (Start a Project guide)1
  2. Provide estimated permit value at application10
  3. Pay fees; the permit is not valid until fees are paid10
  4. Request all required inspections10
  5. Get a final inspection on every trade attachment5
Apply online
Yes1

Permit expiration and extensions

How long a permit lasts
Administratively closed if no valid inspection within six months of issuance; void if no inspection within 1 year (or work abandoned 1 year) and not substantially complete10
Extensions
One extension up to 180 days, requested before expiration with justifiable cause10

Inspections in Colorado Springs

Colorado Springs’s inspection stages, in order. Do not cover work until the stage has passed (how inspections work).

  1. DECK11
  2. BASEMENT FINISH11
  3. ADDITION11
  4. ELECTRIC PANEL CHANGE-OUT11
  5. Inspection request and correction of deficiencies10
  6. Inspector arrival estimate5
How to schedule
Phone, in person, or online (homeowner account); same-day inspection if scheduled by 8:29 am5
Re-inspection fee
$50.00 for 1st incident $100.00 for 2nd incident $200.00 for 3rd incident, plus 2 work day inspection delay9
After the final inspection
Certificate of occupancy required before new building is used or occupied (exceptions: Group U occupancies; manufactured buildings per RBC309.15; work exempt under RBC105.2)10

Building without a permit in Colorado Springs

ConsequenceApplies toAs the city states itWay to fix it
Investigation fee PPRBC 2023 § RBC108.4; Appendix B Table E item RWork commenced without a required permit9Equal to two times the Permit Fee9Obtain the permit after a special investigation; investigation fee is in addition to the permit fee9
Criminal penalty Colorado Springs City Code § 7.5.1401 (Ord. 23-16)Any person violating the Building Code8Fine not more than $500, or up to 90 days jail, or both; each day a separate offense8–
Civil penalty Colorado Springs City Code § 7.5.1401 (Ord. 23-16)Persons/entities doing construction or construction consulting work in violation of the Code8Administrative fine up to $1,0008–
Stop-work orderNon-permitted work reported or observed1Stop work order until proper permit is obtained1–
Lien or recorded notice PPRBC 2023 § RBC103.13 (as adopted by Ord. 23-16)Work requiring a permit for which no permit is obtained1Certificate of Alleged Non-compliance recorded against the property1–

For how unpermitted work is usually legalized, see how to legalize unpermitted work.

Doing the work yourself (owner-builder)

Homeowner may pull a building permit
Yes1
Owner and occupancy requirement
Must own and reside in the property (primary residence); not for rentals1
Sale or rental limits
Owner-built new dwellings limited to one per 12 months and five per lifetime10

Colorado's statewide owner-builder and licensing rules are on the Colorado permit guide.

Colorado rules that also apply in Colorado Springs

Sources

  1. Homeowner Permit Information - PPRBDPikes Peak Regional Building Department (PPRBD)Checked November 7, 2026
  2. Start a Project - PPRBDPikes Peak Regional Building Department (PPRBD)Checked November 7, 2026
  3. About Us - Pikes Peak Regional Building DepartmentPikes Peak Regional Building Department (PPRBD)Checked November 7, 2026
  4. Locations, Hours, Phone Numbers, Holiday Schedule - PPRBDPikes Peak Regional Building Department (PPRBD)Checked November 6, 2026
  5. Permit Guidelines for Homeowners (PPRBD handout)Pikes Peak Regional Building Department (PPRBD)Checked November 7, 2026
  6. Planning Department | City of Colorado SpringsCity of Colorado Springs, Planning DepartmentChecked November 6, 2026
  7. Code Changes - Pikes Peak Regional Building DepartmentPikes Peak Regional Building Department (PPRBD)Checked November 6, 2026
  8. City of Colorado Springs Ordinance No. 23-16 (adoption of the Pikes Peak Regional Building Code, 2023 Edition, and…City of Colorado Springs, City Council (Ordinance 23-16, PDF hosted by PPRBD)Effective April 10, 2023Checked November 7, 2026
  9. Fee Schedule - Pikes Peak Regional Building Department (Appendix B: Fee Schedule, 2023 PPRBC)Pikes Peak Regional Building Department (PPRBD)Effective June 30, 2025Checked November 7, 2026
  10. 2023 Pikes Peak Regional Building Code, 2nd PrintingPikes Peak Regional Building Department (PPRBD)Published June 30, 2026Checked November 7, 2026
  11. Required Inspections by Project - PPRBDPikes Peak Regional Building Department (PPRBD)Checked November 7, 2026