Building permits in Virginia Beach are issued by the Permits & Inspections Division (Planning & Community Development)1. You can apply and request inspections online through cvb-prod.accela.com2.

Last checked

On this page
  1. Building department contacts
  2. Building codes in force in Virginia Beach
  3. Virginia Beach building permit fees
  4. How to get a building permit in Virginia Beach
  5. Permit expiration and extensions
  6. Inspections in Virginia Beach
  7. Building without a permit in Virginia Beach
  8. Doing the work yourself (owner-builder)
  9. Virginia rules that also apply in Virginia Beach
  10. Sources

Building department contacts

Permits & Inspections Division (Planning & Community Development)1

Building permits

Address
Building 3, Municipal Center, 2403 Courthouse Drive, Virginia Beach, VA 23456
1
Hours
8 a.m.-5 p.m. Monday-Friday1
Inspections
Online through the Accela Public Portal, 24/7; up to five working days ahead; must be scheduled before 8 a.m. for same-day3

Zoning Administration (Planning & Community Development)4

Zoning and planning

Address
Building 3, Municipal Center, 2403 Courthouse Drive, Virginia Beach, VA 23456
4
Hours
8 a.m.-5 p.m. Monday-Friday4

Development Services Center (DSC)7

Public works and right-of-way

Address
Building 3, Municipal Center, 2403 Courthouse Drive, Virginia Beach, VA 23456
7
Hours
8 a.m.-5 p.m. Monday-Friday7

Planning & Community Development, Floodplain Management8

Floodplain

Phone
(757) 385-8615 (Whitney McNamara, CFM); flood zone determinations (757) 385-46218

Planning Administration Environmental Team (waterfront / CBPA / flood zone approvals)3

Floodplain

Permits & Inspections fire inspectors (fire protection system permits/inspections)9

Fire marshal

Building codes in force in Virginia Beach

These are the model codes Virginia Beach enforces, with the edition and the date it took effect. Plans are reviewed and work is inspected against them. For the state framework, see Virginia building codes.

CodeTitle as adoptedModel editionEffective
State codeUniform Statewide Building Code (administered by Permits & Inspections)120211011
International Residential Code (IRC)2021 International Residential Code as referenced in the VCC (Virginia Residential Code, "VRC")1020211011

Adopted by: Virginia Board of Housing and Community Development12.

Virginia Beach building permit fees

Fees come from the Residential Building Permit Fees (Permits and Inspections), rev. Jul-202513.

How valuation is set. Construction value (alterations, roofing/siding, pools, mechanical); square feet (new living area and additions)13.

Each line is worded as in Virginia Beach’s schedule; formulas are not added up into a total (how permit fees work).

FeeTypeAs the schedule states it
Residential living area (heated), new and additionsPer square foot$50.00 plus $7.00 per 100 square feet of area or fraction thereof13
Non-heated residential, new and additionsPer square foot$50.00 plus $4.00 per 100 square feet of area or fraction thereof13
Residential alterationsBased on project valuation$50.00 plus $5.00 per $1000 of construction value or fraction thereof13
Roofing and siding permitBased on project valuation$50.00 plus $5.00 per $1000 of construction value or fraction thereof14
In-ground and above ground pool permitBased on project valuation$50 plus $5 per $1,000 of construction value3
Pool fence permit–$60.60 (includes 2% state levy and technology fee)3
Right-of-way fee (in-ground pools only)Flat fee$353
Fence permit (Zoning, fences/walls within 30 ft of a public right-of-way)Flat fee$616
Residential Plan Review FeePlan review$100.0013
Residential Counter Plan ReviewPlan review$25.0013
Residential Plan Review RevisionPlan review$25.0013
Certificate of OccupancyFlat fee$75.0013
Re-inspection FeeRe-inspection$75.0013
Right of Way FeeFlat fee$35.0013
Water Service LineFlat fee$50.0013
Sewer Service LineFlat fee$50.0013
Administrative Fee for beginning work without a permitWork started without a permit$250.0013
State levyState surcharge2% of permit fees13
Technology FeeTechnology surcharge$10.00 on all permits13
Electrical: New Service Single PhaseFlat fee$50.00 plus $20.00 per 50 amps; Change of Service = 1/2 of New Service Fees9
Electrical: 200 amp single-phase change of service (table cell)Flat feeChange of Service Up to 200 amps: $65.009
Electrical: additions or repairsFlat fee$50.00 plus $5.00 per circuit9
Electrical: generator circuit, panel replacement/relocation, meter base, pool bonding, etc.Flat fee$50.00 each9
Gas permitPer fixture or item$50 plus $4 per outlet/shutoff9
Mechanical permitBased on project valuation$50 plus $5 per $1,000 of the construction value9
Plumbing permitPer fixture or item$50 plus $6 per fixture/drain9
Plumbing/Mechanical plan reviewPlan review$509
Demolition permitFlat fee$50 per structure/building2
Accela online payment: ACH/eCheck processing fee (vendor)Flat fee$2.15 per transaction15
Accela online payment: credit card processing fee (vendor)–$3.63 for transactions $100 or less; 3.47% over $10015

How to get a building permit in Virginia Beach

  1. Check whether the work needs a permit (list of residential work requiring permits)3
  2. Get zoning-approved site plan (and DSC approval where needed) for additions, decks, sheds, pools3
  3. Check environmental approvals for CBPA, flood zone or Southern Rivers Watershed properties3
  4. Apply online through the Accela Public Portal (or at the counter for small plan sets)2
  5. Plan review: 15-45 business days for the initial online review; revisions half that2
  6. Schedule required inspections at each stage3
  7. Final inspection; utility release generated after all finals approved9
Apply online
Yes2
Over-the-counter permits
Residential counter review: additions, alterations and accessory structures 500 sq ft or less, uncovered decks of any size; plan set max five pages2
Posting the permit
Yes16

Permit expiration and extensions

How long a permit lasts
May be revoked if work not started within 6 months or suspended/abandoned 6 months16
Extensions
1 year16

Inspections in Virginia Beach

Virginia Beach’s inspection stages, in order. Do not cover work until the stage has passed (how inspections work).

  1. New buildings / additions / storage: setback/footing, slab/foundation, framing/insulation, final3
  2. Interior alterations: framing/insulation, final3
  3. Siding / EIFS / roofing / fences: final3
  4. Garages / sheds over 256 sq ft: setback/footing, framing/insulation, final3
  5. Above-ground pools: final3
  6. In-ground pools: setback/footing, final3
  7. Decks / screened-in porches: setback/footing, slab/foundation, framing/insulation, final3
  8. Trailers / mobile homes: setback/footing, final3
  9. Electrical, residential new service/new wiring: rough-in, slab, trenching, final9
  10. Electrical, panel/meter replacement or relocation: final9
  11. Mechanical, new or replacement gas appliance: rough-in and final9
  12. Gas piping: pressure test and final9
  13. Plumbing, residential on slab: slab, top out, shower pan, water, sewer, final9
  14. Final inspection / certificate of occupancy13
How to schedule
Online through the Accela Public Portal, 24/7; up to five working days ahead; must be scheduled before 8 a.m. for same-day3
Re-inspection fee
$75.0013
After the final inspection
Certificate of occupancy within five working days after final approval17

Building without a permit in Virginia Beach

ConsequenceApplies toAs the city states it
Investigation feeBeginning work without a permit (building, electrical, gas, mechanical, plumbing, demolition, elevator permits)13$250.00 administrative fee13
Criminal penalty Va. Code § 36-106Any USBC violation18Fine of not more than $2,50018
Civil penalty Va. Code § 36-106Locality civil penalty schedule (optional local ordinance)18Not more than $100 initial summons; not more than $350 each additional18

For how unpermitted work is usually legalized, see how to legalize unpermitted work.

Doing the work yourself (owner-builder)

Homeowner may pull a building permit
Yes3
Homeowner electrical work
Yes9
Homeowner plumbing work
Yes9
Owner and occupancy requirement
One primary residence owned by him and for his own use, per 24 months19
Sale or rental limits
CO required before conveying unless purchaser acknowledges in writing19
Affidavit or declaration
Notarized Affidavit of Permit Authorization when an agent (not lessee/architect/engineer/contractor) applies for the owner20

Virginia's statewide owner-builder and licensing rules are on the Virginia permit guide.

Virginia rules that also apply in Virginia Beach

Sources

  1. Permits & Inspections | City of Virginia BeachCity of Virginia Beach, Planning & Community Development, Permits & Inspections DivisionChecked November 7, 2026
  2. Building Permits | City of Virginia BeachCity of Virginia Beach, Planning & Community Development, Permits & InspectionsChecked November 7, 2026
  3. Residential Building Permits | City of Virginia BeachCity of Virginia Beach, Planning & Community Development, Permits & Inspections DivisionChecked November 7, 2026
  4. Zoning Administration | City of Virginia BeachCity of Virginia Beach, Planning & Community Development, Zoning AdministrationChecked November 7, 2026
  5. City of Virginia Beach Public Portal (Accela)City of Virginia BeachChecked November 7, 2026
  6. Fence and Wall BulletinCity of Virginia Beach, Planning & Community Development, Zoning AdministrationRevised November 2025Checked November 7, 2026
  7. Development Services Center | City of Virginia BeachCity of Virginia Beach, Planning & Community Development, Development Services CenterChecked November 7, 2026
  8. Floodplain Management | City of Virginia BeachCity of Virginia Beach, Planning & Community DevelopmentChecked November 7, 2026
  9. Trades Permits | City of Virginia BeachCity of Virginia Beach, Planning & Community Development, Permits & Inspections DivisionChecked November 7, 2026
  10. 13VAC5-63-10. Section 101 GeneralCommonwealth of Virginia, Division of Legislative Automated Systems (Virginia Administrative Code)Effective January 18, 2024Checked November 7, 2026
  11. Codes | DHCDVirginia Department of Housing and Community Development (DHCD)Checked November 7, 2026
  12. Virginia Uniform Statewide Building Code (USBC) | DHCDVirginia Department of Housing and Community Development (DHCD)Checked November 7, 2026
  13. Residential Building Permit FeesCity of Virginia Beach, Planning & Community Development, Permits & Inspections DivisionRevised July 2025Checked November 7, 2026
  14. Roofing and Siding Permit FeesCity of Virginia Beach, Planning & Community Development, Permits & Inspections DivisionRevised July 2025Checked November 7, 2026
  15. Accela Public Portal Processing Fees | City of Virginia BeachCity of Virginia Beach, Planning & Community DevelopmentChecked November 7, 2026
  16. 13VAC5-63-100. Section 110 PermitsCommonwealth of Virginia, Division of Legislative Automated Systems (Virginia Administrative Code)Effective January 18, 2024Checked November 7, 2026
  17. 13VAC5-63-160. Section 116 Certificates of occupancyCommonwealth of Virginia, Division of Legislative Automated Systems (Virginia Administrative Code)Effective January 18, 2024Checked November 7, 2026
  18. § 36-106. Violation a misdemeanor; civil penaltyCommonwealth of Virginia, Division of Legislative Automated Systems (Virginia Law, Code of Virginia)Checked November 7, 2026
  19. § 54.1-1101. Exemptions; failure to obtain certificate of occupancy; penaltiesCommonwealth of Virginia, Division of Legislative Automated Systems (Virginia Law, Code of Virginia)Checked November 7, 2026
  20. Affidavit of Permit AuthorizationCity of Virginia Beach, Planning & Community Development, Permits & Inspections DivisionRevised November 2025Checked November 7, 2026