Building permit glossary

Permit and code terms in plain English.

Building permit
Written approval from the local building department to do regulated construction work. It comes with inspections. More
Building code
The rules for how buildings must be built: structure, fire safety, egress, energy and the trade systems. Usually a model code adopted by the state or city, with amendments. More
International Residential Code (IRC)
The model code for one- and two-family homes and townhouses, published every three years and adopted by most states or cities. More
R105.2
The IRC section listing work exempt from a permit. States and cities often edit it. More
Exempt work
Work a code says needs no permit, usually with size or height limits. It must still meet the code and zoning. More
Zoning
Local rules on land use, setbacks, height and lot coverage. Separate from the building code. More
Zoning permit
Approval that a structure is allowed where proposed under zoning rules. More
Setback
The minimum distance a structure must keep from a property line or another structure. More
Lot coverage
The share of a lot that buildings may cover under zoning. More
Variance
Permission from a zoning board to depart from a zoning rule on a specific property.
Valuation
The value of the work used to calculate many permit fees, set by the department’s method or the contract price. More
Plan review
The department’s check of drawings against the code before a permit is issued; often has its own fee. More
Over-the-counter permit
A permit issued the same day without full plan review, for simple work. More
Rough-in inspection
Inspection of wiring, piping or ductwork before walls and ceilings are closed. More
Footing inspection
Inspection of the excavation and reinforcement before concrete is poured. More
Framing inspection
Inspection of the structure after framing and before insulation and drywall. More
Final inspection
The last inspection; passing it closes the permit. More
Certificate of occupancy (CO)
The department’s statement that a building or new space complies and may be occupied. More
Re-inspection fee
A charge some cities make when an inspection must be repeated. More
Permit expiration
The point at which an unused or inactive permit becomes invalid. More
Owner-builder
A property owner who pulls the permit and does or directs the work instead of a licensed contractor. More
Licensed contractor
A contractor holding the state or local license required for the type of work. More
Unpermitted work
Work that needed a permit and did not get one, or never passed final inspection. More
After-the-fact (as-built) permit
A permit obtained for work already done, followed by inspections. More
Investigation fee
An extra fee some cities charge when work started before the permit. More
Stop-work order
An order from the building official to halt work until a violation is resolved. More
Seller disclosure
A state-required statement in which a seller reports known defects, often including unpermitted work. More
Shot clock
A legal deadline for a government to decide a permit application. More
Home rule
The power of cities to adopt their own rules, including codes, where state law allows. More
Egress window
A window large enough and low enough to escape through in an emergency. More
Guard
A barrier along an open-sided walking surface, such as a deck, to prevent falls. More
GFCI
Ground-fault circuit interrupter: a device that cuts power when current leaks to ground. More
Accessory dwelling unit (ADU)
A second, smaller home on the same lot as a house. More
Pool barrier
A fence, wall or other barrier around a pool required by code. More