Boston building permits
Building permits in Boston are issued by the Inspectional Services Department (ISD)1. You can apply and request inspections online through onlinepermitsandlicenses.boston.gov2.
On this page
- Building department contacts
- Building codes in force in Boston
- Boston building permit fees
- How to get a building permit in Boston
- Permit expiration and extensions
- Inspections in Boston
- Building without a permit in Boston
- Doing the work yourself (owner-builder)
- Massachusetts rules that also apply in Boston
- Sources
Building department contacts
Inspectional Services Department (ISD)1
Building permits
- Website
- boston.gov1
- Apply online
- onlinepermitsandlicenses.boston.gov2
- Phone
- (617) 635-53002
- [email protected]2
- Address
- 1010 Massachusetts Avenue, 5th Floor, Boston, MA 021182
- Hours
- Monday through Friday, 8 a.m. - 4 p.m.3
- Inspections
- Call center 617-635-5300; an inspector calls back within 48 hours4
Zoning Board of Appeal (ISD)5
Zoning and planning
- Website
- boston.gov5
- Phone
- (617) 635-47755
- Address
- 1010 Mass. Ave, 4th Floor, Boston, MA 021185
Boston Fire Department, Fire Prevention Division6
Fire marshal
- Website
- boston.gov6
- Apply online
- onlinepermitsandlicenses.boston.gov7
- Phone
- (617) 343-36286
Boston Landmarks Commission (Office of Historic Preservation)8
Historic preservation
- Website
- boston.gov8
To look up permits already issued for an address (useful before you buy, or to check a contractor's work), use the city's official permit search: scerisecm.boston.gov3.
Building codes in force in Boston
These are the model codes Boston enforces, with the edition and the date it took effect. Plans are reviewed and work is inspected against them. For the state framework, see Massachusetts building codes.
| Code | Title as adopted | Model edition | Effective |
|---|---|---|---|
| International Residential Code (IRC) | 780 CMR 51.00: Massachusetts Residential Code10 | 202111 | 11 |
| International Building Code (IBC) | 780 CMR, Massachusetts State Building Code, Tenth Edition, Base Volume13 | 202111 | 11 |
| International Existing Building Code (IEBC) | International Existing Building Code 2021 as amended10 | 202111 | 11 |
Adopted by: Board of Building Regulations and Standards12.
Transition rules. June 30, 202511.
Boston building permit fees
Fees come from the Fee Schedule (ISD 'Building Fees 5 15 23' PDF)14.
How valuation is set. Estimated cost of work15.
Each line is worded as in Boston’s schedule; formulas are not added up into a total (how permit fees work).
| Fee | Type | As the schedule states it |
|---|---|---|
| Short Form Building | Based on project valuation | $20.00 Primary fee plus $10.00 per $1,000 of the estimated cost of work.15 |
| Long Form Building | Based on project valuation | $50.00 Primary fee plus $10.00 per $1,000.00 of the estimated cost of work.15 |
| Amendment | Based on project valuation | $20.00 Primary fee plus $10.00 per $1,000.00 of the estimated cost of work.15 |
| Plumbing | Per fixture or item | $20.00 Primary fee plus $5.00 each fixture.15 |
| Electrical (no change in service) | Per fixture or item | $20 application fee, plus $1 for each fixture, plug, or outlet, and $5 for each approved meter.16 |
| Electrical (upgrading or new service) | Flat fee | $20 application fee, plus $0.25/amp up to 240 volts, or $0.75/amp over 480 volts.16 |
| Electrical (other) | Based on project valuation | $20 application fee, plus $10 per $1,000 of the estimated cost.16 |
| Gas appliances | Flat fee | $20, plus $5 per meter.17 |
| Gas boilers, heaters, furnaces, industrial ovens | – | $20, plus $50 each, plus $0.09 per 1,000 BTU.17 |
| Change of Occupancy, 3 Family and under | Flat fee | 3 Family and under $20.00 fee15 |
| Use of Premises | Flat fee | $50.00 Primary fee15 |
| Board of Appeal | Flat fee | One -Three family; $150.00 Fee primary Four family and up or Commercial; $150.00 Fee for each violation cited.15 |
| Nominal Fee | Flat fee | $300.00 Nominal Fee plus $50.00 Application fee15 |
| Certificate of Occupancy | – | $50, plus 1 percent of the project’s total construction cost9 |
| Off Hour Inspections | After-hours inspection | $250.00 per inspector15 |
| Off Hour Permits | After-hours inspection | $100.00 per day15 |
| Double Fee | Work started without a permit | DOUBLE FEE When work has been started without required permit or undervalue in the estimated cost.15 |
How to get a building permit in Boston
- Gather required documents2
- Apply and pay in the ISD online portal2
- Obtain external approvals (Planning and Zoning, Parks, Landmarks) and upload them2
- Wait for the issued permit before starting work2
- Request inspection when work is finished2
- Confirm permit is closed2
Permit expiration and extensions
- How long a permit lasts
- Work must start within six months of issuance2
- Extensions
- Possible 180-day extension for eligible projects2
Inspections in Boston
Boston’s inspection stages, in order. Do not cover work until the stage has passed (how inspections work).
- Rough and final inspections (at least two for most work)19
- Footing and Insulation inspections (listed portal inspection types)19
- How to schedule
- Call 617-635-5300 or request in the portal; inspector contacts within 48 hours19
- After the final inspection
- Certificate of Occupancy, required for new construction, major renovations that change a building’s use, occupancy, egress or life safety systems, and change of use or occupancy (or if the property has no CO); issued within 10 days after passed inspections and approved documents9
Building without a permit in Boston
| Consequence | Applies to | As the city states it |
|---|---|---|
| Higher permit fee | Work started without required permit, or undervalued estimated cost15 | Double fee15 |
| Civil penalty | Starting work before permit issuance2 | Charge double the permit cost, or issue a building code violation2 |
| Penalty 780 CMR R114.4; M.G.L. c. 143, § 94(a) | Violations of 780 CMR, including work contrary to approved construction documents, a building official directive, or a permit or certificate (statewide; applies in Boston)10 | Penalties as prescribed by M.G.L. c. 143, § 94(a), M.G.L. c. 148, § 34C, or M.G.L. c. 148A (amounts are in the statute)10 |
| Stop-work order 780 CMR 115 | Work contrary to 780 CMR or dangerous/unsafe13 | Continuing after stop work order: penalties under M.G.L. c. 143, § 94(a)13 |
For how unpermitted work is usually legalized, see how to legalize unpermitted work.
Doing the work yourself (owner-builder)
- Homeowner may pull a building permit
- Yes, for 1-2 family owner-occupied homes when doing the work themselves2
- Homeowner electrical work
- No16
- Homeowner plumbing work
- No20
- Owner and occupancy requirement
- Owner resides or intends to reside on the parcel with a one- or two-family dwelling; condo owners in 3+ unit buildings must hire a contractor21
- Sale or rental limits
- Person who builds more than one home in two years is not a homeowner21
- Affidavit or declaration
- Homeowner Waiver (Construction License Exemption for Home Owner form) plus MA Workers' Compensation Affidavit2
Massachusetts's statewide owner-builder and licensing rules are on the Massachusetts permit guide.
Massachusetts rules that also apply in Boston
- Deadlines for permit decisions and inspections in Massachusetts
- Contractor licensing in Massachusetts
- Private plan review and inspections in Massachusetts
Sources
- Inspectional Services | Boston.govCity of Boston, Inspectional Services DepartmentChecked November 7, 2026
- Short-Form PermitCity of Boston, Inspectional Services DepartmentLast updated November 4, 2026Checked November 7, 2026
- How to Find Historical Permit RecordsCity of Boston, Inspectional Services DepartmentLast updated October 30, 2025Checked November 7, 2026
- Inspectional Services ContactsCity of Boston, Inspectional Services DepartmentLast updated November 2, 2026Checked November 7, 2026
- Zoning Board of AppealCity of Boston, Inspectional Services DepartmentLast updated October 27, 2026Checked November 6, 2026
- Fire PreventionCity of Boston, Boston Fire Department, Fire Prevention DivisionChecked November 6, 2026
- Boston PermittingCity of BostonLast updated October 26, 2026Checked November 6, 2026
- Landmarks CommissionCity of Boston, Office of Historic Preservation, Boston Landmarks CommissionChecked November 6, 2026
- Certificate of OccupancyCity of Boston, Inspectional Services DepartmentLast updated September 29, 2026Checked November 7, 2026
- 780 CMR 51.00 Massachusetts Residential Code, Chapter R1 Scope and Application (10th ed., unofficial copy)Commonwealth of Massachusetts, Board of Building Regulations and StandardsChecked November 7, 2026
- Tenth Edition CMR 780Commonwealth of Massachusetts, Board of Building Regulations and StandardsPublished October 11, 2024Checked November 7, 2026
- Massachusetts State Building Code - 780 CMRCommonwealth of Massachusetts, Board of Building Regulations and StandardsChecked November 6, 2026
- 780 CMR Chapter 1 Scope and Administration (10th ed. Base Volume, unofficial copy)Commonwealth of Massachusetts, Board of Building Regulations and StandardsChecked November 6, 2026
- Building Forms and ApplicationsCity of Boston, Inspectional Services DepartmentLast updated November 5, 2026Checked November 7, 2026
- Building Fees 5 15 23 (ISD fee schedule)City of Boston, Inspectional Services DepartmentChecked November 7, 2026
- Electrical PermitCity of Boston, Inspectional Services DepartmentLast updated September 11, 2026Checked November 7, 2026
- Gas PermitCity of Boston, Inspectional Services DepartmentLast updated September 11, 2026Checked November 7, 2026
- Permitting Your Accessory Dwelling UnitCity of Boston, Mayor's Office of HousingLast updated July 29, 2025Checked November 7, 2026
- How to Schedule an InspectionCity of Boston, Inspectional Services DepartmentLast updated September 15, 2026Checked November 7, 2026
- Plumbing PermitCity of Boston, Inspectional Services DepartmentLast updated September 11, 2026Checked November 7, 2026
- Construction License Exemption for Home Owner(s) (ISD6.04RSO)City of Boston, Inspectional Services DepartmentChecked November 7, 2026