Do you need a permit for a fence in Seattle?

It depends on the project. Seattle exempts some fences from a building permit and requires one for the rest1; the exemption's limit is 8 feet, with the conditions in the city's wording below.

Last checked

On this page
  1. Which permits you need
  2. Limits and conditions in Seattle's rule
  3. Zoning rules: separate from the building permit
  4. What to submit
  5. Who can apply
  6. Fence permit fees in Seattle
  7. Special areas and extra reviews
  8. Who to ask
  9. Fence permit rules in other cities
  10. Sources

Depends on size or scope

Seattle's rule

“You don’t need a permit if you’re building a fence with a total height of 8 feet high or less that doesn’t have masonry or concrete elements over 6 feet.”1

City of Seattle, Seattle Department of Construction & Inspections, What Permits Do You Need?

Which permits you need

PermitRequired whenThe city’s wording
Building permitFence taller than the exemption (over 8 ft, or masonry/concrete elements over 6 ft)If you’re building a taller fence, you need a construction permit.1
Building permitFence located in a flood-prone areaYou will need a construction permit if the fence will be located in a flood-prone area.1

Limits and conditions in Seattle's rule

Each limit sits next to the sentence it comes from; the conditions in that sentence are part of the rule.

RuleValueThe city’s wording
Exempt up to this height8 feetFences not over 8 feet high that do not have masonry or concrete elements above 6 feet.2
Masonry or concrete parts exempt up to6 feetFences not over 8 feet high that do not have masonry or concrete elements above 6 feet.2

Zoning rules: separate from the building permit

A project can be exempt from one and still need the other (zoning vs building permits).

Zoning ruleValueThe city’s wording
Maximum height in side and rear yards6 feetIn neighborhood residential and multifamily zones, our zoning code limits your fence height to 6 feet, with an additional 2 feet of architectural features such as arbors or trellises.1
Maximum height in the front yard4 feetWe limit the height of the fence to 4 feet when it is located in a front or street side setback.1
Sloping sites8 feetOn a sloping site, your fence can be 8 feet high, if the average height between posts is 6 feet.1
Fence on a retaining wall: combined maximum9 ft 6 inIf your fence is placed above a retaining wall used to raise the grade of your property, the combined height of the retaining wall and fence is limited to nine feet and six inches (9’-6”).1

What to submit

  • Application plus scaled plans: site plan, section and detail drawings1

Who can apply

  • Owner may prepare the drawings or hire a professional1

Fence permit fees in Seattle

Fee lines as Seattle's schedule states them. A minimum or base fee is not the whole price when the line says the fee grows with project value.

FeeTypeAs the schedule states it
STFI permit fee / plan review feeBased on project valuationPermit fee 100% of DFI; plan review fee 40% of DFI3

All of Seattle's fee lines are on the Seattle permit page.

Special areas and extra reviews

  • Environmentally critical areas have different restrictions1

Who to ask

Seattle Department of Construction & Inspections (SDCI)1

Building permits

Address
700 5th Ave, Suite 2000, Seattle, WA 98104 (mailing: P.O. Box 34019, Seattle, WA 98124-4019)
1
Hours
Most staff 8 AM - 4 PM (phone or email)5
Inspections
Online, or 24-hour line (206) 684-89006

Fence permit rules in other cities

Rules differ from city to city. Compare Seattle with 18 other cities on the national fence permit guide, or go straight to one:

Sources

  1. Fences - Construction and InspectionsCity of Seattle, Seattle Department of Construction & InspectionsChecked November 7, 2026
  2. 2021 Seattle Residential Code, Chapter 1 AdministrationCity of Seattle, Seattle Department of Construction & InspectionsChecked November 7, 2026
  3. 2026 Fee Subtitle and related documents (SMC Chapter 22.900)City of Seattle, Seattle Department of Construction & InspectionsEffective January 1, 2026Checked November 7, 2026
  4. How Do You Get a Permit? - Construction and InspectionsCity of Seattle, Seattle Department of Construction & InspectionsChecked November 7, 2026
  5. Contact Us - Hours & LocationCity of Seattle, Seattle Department of Construction & InspectionsChecked November 6, 2026
  6. Construction Inspections - Construction and InspectionsCity of Seattle, Seattle Department of Construction & InspectionsChecked November 7, 2026