Do you need a permit for a siding replacement?
Permits for siding replacements are set locally: the city or county building department decides, under the code it has adopted. Below are the official rules and fees we verified, in each department's own words.
On this page
What the model code exempts (IRC R105.2)
The International Residential Code (IRC) is a model code. It is law only where a state or city adopts it, usually with changes, so the wording below shows how the model reads in published government copies, not the rule where you live.
11. Repairs that are limited to 25 percent of roof covering and building siding within one calendar year.
1 As published by Old Lyme, CT (as amended in Connecticut).
What cities charge for a siding replacement permit
Fee lines as each city’s schedule states them, never added up into a total; how permit fees work explains valuation formulas and minimums.
| City | Fee | As the schedule states it |
|---|---|---|
| Columbus, OH | Roof, Siding, Windows, and Doors (1, 2, and 3 Family) | Roof, Siding, Windows, and Doors (1 inspection) $1402 |
| El Paso, TX | Building Permits: building/siding | $110 plus applicable technology fee3 |
| Las Vegas, NV | Exterior Improvements (e.g., siding, stucco, windows) | 85 Exterior Improvements (e.g., siding, stucco, windows) $135 $1514 |
| Boston, MA | Short Form Building | $20.00 Primary fee plus $10.00 per $1,000 of the estimated cost of work.5 |
| Baltimore, MD | Exterior-only alterations / interior doors only, 1- and 2-family | Exception: For the following, the fee is $10 for each $1,000 or fraction of $1,000 estimated cost, subject to a minimum fee of $50 –6 |
| Fresno, CA | Stucco / Siding Applications - each | Stucco / Siding Applications - each 33.82 222.997 |
| Colorado Springs, CO | Stucco | Stucco $135.008 |
| Colorado Springs, CO | Wood / Composite Siding | Wood / Composite Siding $115.008 |
| Virginia Beach, VA | Roofing and siding permit | $50.00 plus $5.00 per $1000 of construction value or fraction thereof9 |
| Aurora, CO | Flat rate: egress window, gas pipe, residential EV charger, residential siding, water heater replacement | $99 EACH • Egress Window Installation • Gas Pipe Installation or Modification • Residential EV Charger • Residential Siding Replacement • Water Heater Replacement10 |
| Aurora, CO | Flat rate: residential roof and siding replacement | $424 • Residential Roof and Siding Replacement10 |
Before you start
Find your city’s siding replacement rule with the permit checker. What to check before you buy materials (city limits, limits in the rule, zoning and HOA rules) and the order of the steps are in how to get a building permit; what an exemption does not cover is in work exempt from a permit.
Sources
- Work Exempt from Building PermitsTown of Old Lyme, CT, Building DepartmentChecked November 7, 2026
- 2026 Combined Development Related Fee ScheduleCity of Columbus, Department of Building and Zoning ServicesPublished 2026Checked November 7, 2026
- City of El Paso FY2026-2027 Adopted Budget, FY 2027 Schedule C Departmental Fee ListCity of El Paso, Office of Management & BudgetAdopted August 18, 2026Checked November 7, 2026
- City of Las Vegas 2020 Building User Fees (Building & Fee Table)City of Las Vegas, Department of Community Development, Building & Safety DivisionEffective July 1, 2021Checked November 7, 2026
- Building Fees 5 15 23 (ISD fee schedule)City of Boston, Inspectional Services DepartmentChecked November 7, 2026
- Section 109. Fees (Building Code)City of Baltimore Law Library (Department of Legislative Reference)Checked November 7, 2026
- City of Fresno Master Fee Schedule - Planning & Development Fees (effective 07/01/2026)City of Fresno, Planning and Development DepartmentEffective July 1, 2026Checked November 7, 2026
- Fee Schedule - Pikes Peak Regional Building Department (Appendix B: Fee Schedule, 2023 PPRBC)Pikes Peak Regional Building Department (PPRBD)Effective June 30, 2025Checked November 7, 2026
- Roofing and Siding Permit FeesCity of Virginia Beach, Planning & Community Development, Permits & Inspections DivisionRevised July 2025Checked November 7, 2026
- 2026 Flat Rate Fee Permits (Flat-Rate Fee, Revised 08/2026, Form #A175)City of Aurora, Development Services Department, Building DivisionRevised August 2026Checked November 7, 2026