Not a government site. Always confirm with your local building department before you build. About us

Building Permit Requirements
Menu

Miami building permits

Building permits in Miami are issued by the City of Miami Building Department1. You can apply and request inspections online through apps.miamigov.com1.

Last checked

On this page
  1. Building department contacts
  2. Building codes in force in Miami
  3. Miami building permit fees
  4. How to get a building permit in Miami
  5. Permit expiration and extensions
  6. Inspections in Miami
  7. Building without a permit in Miami
  8. Doing the work yourself (owner-builder)
  9. Florida rules that also apply in Miami
  10. Sources

Building department contacts

City of Miami Building Department1

Building permits

Website
miami.gov1
Apply online
apps.miamigov.com1
Address
Miami Riverside Center, 444 SW 2nd Ave, 4th floor, Miami 33130
1
Hours
Mon-Fri 7:30 AM-4:30 PM; all building functions close to the public at 3:30 PM1
Inspections
Online via iBuild or call 311; (305) 416-1100 Option 22

City of Miami Office of Zoning3

Zoning and planning

Website
miami.gov3
Phone
(305) 416-1495 (alternate); 3113
Address
Miami Riverside Center (MRC), 444 SW 2nd Avenue, 2nd Floor, Miami 33130
3
Hours
Mon-Fri 8:00 AM-5:00 PM; zoning functions close to the public at 2:30 PM3

City of Miami Building Department, Unsafe Structures (work without permit complaints)4

Code enforcement

Phone
(305) 416-1177; anonymous reports via 3114

City of Miami Code Compliance Department5

Code enforcement

To look up permits already issued for an address (useful before you buy, or to check a contractor's work), use the city's official permit search: miami.gov6.

Building codes in force in Miami

These are the model codes Miami enforces, with the edition and the date it took effect. Plans are reviewed and work is inspected against them. For the state framework, see Florida building codes.

CodeTitle as adoptedModel editionEffectiveAdopted by
International Building Code (IBC)Florida Building Code- Building / 8th Edition (2023)1202171Florida Building Commission8
International Residential Code (IRC)Florida Building Code- Residential / 8th Edition (2023)1202191Florida Building Commission8
International Existing Building Code (IEBC)Florida Building Code- Existing Building / 8th Edition (2023)12021101Florida Building Commission8
International Plumbing Code (IPC)Florida Building Code- Plumbing / 8th Edition (2023)12021111Florida Building Commission8
International Mechanical Code (IMC)Florida Building Code- Mechanical / 8th Edition (2023)12021121Florida Building Commission8
International Fuel Gas Code (IFGC)Florida Building Code- Fuel Gas / 8th Edition (2023)12021131Florida Building Commission8
Energy code, residentialFlorida Building Code- Energy Conservation / 8th Edition (2023)12021141Florida Building Commission8
Energy code, commercialFlorida Building Code- Energy Conservation / 8th Edition (2023)12021141Florida Building Commission8
National Electrical Code (NEC)National Electrical Code (NEC) / (NFPA 70) / 2020 Edition1202011Florida Building Commission8
State codeFlorida Fire Prevention Code / 8th Edition12021151State Fire Marshal16
State codeFlorida Building Code- Accessibility / 8th Edition (2023)1–1Florida Building Commission8

Transition rules. Permit application date controls the code edition8.

Miami building permit fees

Fees come from the Exhibit C Fee Schedule, Building, Chapters 10, 17, 20 (Resolution R-26-0200)17, effective 18.

How valuation is set. Estimated construction cost (labor and materials)17.

Each line is worded as in Miami’s schedule; formulas are not added up into a total (how permit fees work).

FeeTypeAs the schedule states it
Building, Plumbing, Mechanical and Electrical - Residential up to 3 units (estimated additions new or remodeling construction costs)Based on project valuationResidential up to 3 units (estimated additions new or remodeling construction costs) 0.50%18
Residential less than estimated $2,500.00Flat feeb. Residential less than estimated $2,500.00 $45.0018
Commercial / Multi-Family equal to or less than $30,000,000.00 of construction costsBased on project valuationc. Commercial / Multi-Family equal to or less than $30,000,000.00 of construction costs 1.00%18
Minimum Permit FeeMinimum feed. Minimum Permit Fee $110.0018
All Permits non-refundable application feeFlat feecc. All Permits non-refundable application fee $40.0018
Solid Waste Residential Surcharge per $100.00 of estimated cost of constructionState surchargeg. Solid Waste Residential Surcharge per $100.00 of estimated cost of construction $0.22 Minium Allowed $26.00 Maximum Allowed $600.0018
Energy Conservation Surcharge, New Construction or Addition per square footPer square footi. Energy Conservation Surcharge New Construction or Addition per square foot $0.1118
Dry run/Up-Front per $1,000.00 of estimated construction valuePlan reviewl. Dry run/Up-Front per $1,000.00 of estimated construction value $2.8018
Revisions / Re-works per discipline after 2nd reviewPlan reviewn. Revisions / Re-works per discipline after 2nd review $56.0018
Re-inspection feeRe-inspectionz. Re-inspection fee $57.0018
Expired Permits ExtensionFlat feex. Expired Permits Extension $100.0018
Completion of Expired PermitBased on project valuationy. Completion of Expired Permit for first $1,000.00 of value of remaining work $32.00 Each additional $1,000.00 $16.0018
Extension of Expired Permit Application (older than 180 days) SFH/Duplex/TriplexFlat feev. Extension of Expired Permit Application (older than 180 days) SFH/Duplex/Triplex $100.0018
CO / CC Residential per unit–s. CO / CC Residential per unit $105.0018
Work without a Permit (after the fact) base fee plus multiplierWork started without a permitf. Work without a Permit (after the fact) base fee plus: $110.00 Homestead Property (Residential) 2x base fee All other Properties (Commercial) 4x base fee18
Case initiation fee for work without a Permit & Unsafe StructuresWork started without a permitll. Case initiation fee for work without a Permit & Unsafe Structures $500.0018
Change of architect, engineer, contractor per PermitFlat feedd. Change of architect, engineer, contractor per Permit $100.0018
Replacement of lost permit card / plan duplicates per sheetFlat feehh. Replacement of lost permit card / plan duplicates per sheet $17.0018
Overtime inspections rate per hourAfter-hours inspectionfff. Overtime inspections rate per hour $225.0018
Private Provider credit–j. Private Provider: Regular Fee with credit for building/ trade Permit fee line: 1/318
File search (administrative services)Flat feeFile search $44.0018

How to get a building permit in Miami

  1. Create an online application in the iBuild portal (building permits)20
  2. Pay upfront fees if applicable20
  3. Upload drawings and documents to ProjectDox (ePlan)20
  4. Permitting Coordinator reviews the application for acceptance20
  5. Plan review; respond to corrections and resubmit20
  6. Pull the permit in iBuild and pay permit fees20
  7. Keep permit card and approved plans on site during work20
  8. Request inspections to close the permit20
Apply online
Yes6
Over-the-counter permits
Walk-Thru Express same-day in-person review for small residential projects (e.g., fences 6 ft or under, driveways, windows/doors/shutters, roofing, kitchen/bath remodels, interior demolition, prefabricated sheds, MEP repairs)19
Posting the permit
Permit card and approved plans must be on site20

Permit expiration and extensions

Extensions
Expired permits with total job cost $10,000 or less can be extended online in iBuild6

Inspections in Miami

Miami’s inspection stages, in order. Do not cover work until the stage has passed (how inspections work).

  1. Inspections for all phases of construction; required inspections are listed on the permit2
  2. Owner-builders request only the building inspection; trade subcontractors request their own2
  3. Virtual inspections available for eligible permits2
How to schedule
Online through iBuild (up to five days in advance) or call 3112
Re-inspection fee
z. Re-inspection fee $57.0018
After the final inspection
Certificate of Occupancy (new construction/change of use) or Certificate of Completion (remodels, renovations, shell buildings)21

Building without a permit in Miami

ConsequenceApplies toAs the city states it
Higher permit fee City of Miami Code Sec. 10-18; Sec. 10-4Work commenced before obtaining a required permit; Homestead vs. non-Homestead/commercial172x (Homestead residential) or 4x (other/commercial) plus $110.00 base fee18
Investigation fee City of Miami Code Sec. 10-18 (Exhibit C)Work without a permit and unsafe structures cases after notice of violation17$500.00 case initiation fee18
Stop-work orderProperty where work without permit is found after a complaint inspection4Violation issued; all work must stop until properly permitted4

For how unpermitted work is usually legalized, see how to legalize unpermitted work.

Doing the work yourself (owner-builder)

Homeowner may pull a building permit
Yes22
Homeowner electrical work
No22
Homeowner plumbing work
No22
Owner and occupancy requirement
Own use and occupancy, not intended for sale; proof of residence required22
Sale or rental limits
No more than one master permit per owner in any 24-month period22
Affidavit or declaration
Yes22

Florida's statewide owner-builder and licensing rules are on the Florida permit guide.

Florida rules that also apply in Miami

Sources

  1. BuildingCity of Miami, Building DepartmentChecked November 7, 2026
  2. Schedule a Building InspectionCity of Miami, Building DepartmentChecked November 7, 2026
  3. ZoningCity of Miami, Office of ZoningChecked November 6, 2026
  4. Report Work Without PermitCity of Miami, Building Department, Unsafe StructuresChecked November 7, 2026
  5. Code ComplianceCity of Miami, Code Compliance DepartmentChecked November 6, 2026
  6. Building FAQsCity of Miami, Building DepartmentChecked November 7, 2026
  7. Analysis of Changes for the 8th Edition (2023) Florida Building Code: BuildingState of Florida, Department of Business and Professional Regulation, Florida Building CommissionChecked November 7, 2026
  8. Fla. Stat. § 553.73 (2026 Florida Statutes)State of Florida, The Florida Senate (Florida Statutes)Published 2026Checked November 7, 2026
  9. Analysis of Changes for the 8th Edition (2023) Florida Codes: ResidentialState of Florida, Department of Business and Professional Regulation, Florida Building CommissionChecked November 7, 2026
  10. Analysis of Changes 8th Edition: Existing BuildingState of Florida, Department of Business and Professional Regulation, Florida Building CommissionChecked November 7, 2026
  11. Analysis of Changes 8th Edition: PlumbingState of Florida, Department of Business and Professional Regulation, Florida Building CommissionChecked November 7, 2026
  12. Analysis of Changes 8th Edition: MechanicalState of Florida, Department of Business and Professional Regulation, Florida Building CommissionChecked November 7, 2026
  13. Analysis of Changes 8th Edition: Fuel GasState of Florida, Department of Business and Professional Regulation, Florida Building CommissionChecked November 7, 2026
  14. Significant Provision Changes in 8th Edition (2023) FBC, Energy ConservationState of Florida, Department of Business and Professional Regulation, Florida Building CommissionChecked November 7, 2026
  15. Rule 69A-60.003, NFPA 1, the Fire Code, Florida 2021 Edition, AdoptedState of Florida, Department of State, Florida Administrative CodeEffective December 31, 2023Checked November 7, 2026
  16. Fla. Stat. § 633.202 (2026 Florida Statutes)State of Florida, The Florida Senate (Florida Statutes)Published 2026Checked November 7, 2026
  17. City of Miami Building Permit Fee ScheduleCity of Miami, Building DepartmentChecked November 7, 2026
  18. Exhibit C Fee Schedule, Building, Chapters 10, 17, 20 (File No. 19087, Exhibit C Sub)City of Miami (City Commission Resolution R-26-0200), Building Department fee scheduleAdopted April 23, 2026Checked November 7, 2026
  19. Walk-Thru Express (Residential)City of Miami, Building DepartmentChecked November 7, 2026
  20. Guide to Getting a PermitCity of Miami, Building DepartmentChecked November 7, 2026
  21. Get a Certificate of Occupancy (CO) or Completion (CC)City of Miami, Building DepartmentChecked November 7, 2026
  22. Become an Owner BuilderCity of Miami, Building DepartmentChecked November 7, 2026