Not a government site. Always confirm with your local building department before you build. About us

Building Permit Requirements
Menu

Washington building code

The residential code in Washington is the International Residential Code, 2021 edition, without chapters 11 and 25-43; Appendices AF, AQ and AWU included1, effective 1.

Last checked

On this page
  1. Codes in force in Washington
  2. Scope, amendments and transition rules
  3. How Washington adopts building codes
  4. Residential code in Washington cities
  5. Sources

Codes in force in Washington

Each code family with the edition and the date it took effect, as the adopting agency or statute states them.

CodeTitle as adoptedModel editionEffectiveAdopted by
International Building Code (IBC)International Building Code, 2021 edition, including Appendix E, with Washington amendments (chapter 51-50 WAC)1202111Washington State Building Code Council, by rule (chapter 51-50 WAC)2
International Residential Code (IRC)International Residential Code, 2021 edition, without chapters 11 and 25-43; Appendices AF, AQ and AWU included1202111Washington State Building Code Council, by rule (chapter 51-51 WAC)2
International Existing Building Code (IEBC)2021 International Existing Building Code1202111Washington State Building Code Council, by rule (chapter 51-50 WAC)2
International Mechanical Code (IMC)International Mechanical Code, 2021 edition, with Washington amendments (chapter 51-52 WAC)1202111Washington State Building Code Council, by rule (chapter 51-52 WAC)2
International Fuel Gas Code (IFGC)International Fuel Gas Code as amended in chapter 51-52 WAC (Mechanical Code)1–1Washington State Building Code Council, by rule (chapter 51-52 WAC)2
International Fire Code (IFC)International Fire Code, 2021 edition, with Washington amendments (chapter 51-54A WAC)1202111Washington State Building Code Council, by rule (chapter 51-54A WAC)2
Uniform Plumbing Code (UPC)Uniform Plumbing Code, 2021 edition, including Appendices A, B, I and M; chapters 12 and 14 not adopted1202111Washington State Building Code Council, by rule (chapter 51-56 WAC)2
Energy code, residentialWashington State Energy Code-Residential1–1Washington State Building Code Council, by rule (chapter 51-11R WAC)2
Energy code, commercialWashington State Energy Code1–1Washington State Building Code Council, by rule (chapter 51-11C WAC)2
National Electrical Code (NEC)National Electrical Code, 2023 edition (NFPA 70-2023), including Annex A, B, C1202313Washington State Department of Labor & Industries (electrical rules, chapter 296-46B WAC)4
Wildland-Urban Interface Code (IWUIC)International Wildland Urban Interface Code (local option)5––Washington State Building Code Council, by rule (chapter 51-55 WAC)2

Scope, amendments and transition rules

International Building Code (IBC)

Scope
Statewide minimum; local governments may go further2
Applies to
All counties and cities2
Local amendments allowed?
Yes not below state minimum; residential amendments need SBCC approval2
Amendments
Chapter 51-50 WAC1
Next edition (not yet in force)
2024 edition planned; implementation date Monday, May 3, 2027 (schedule, not yet adopted)6

International Residential Code (IRC)

Scope
Statewide minimum; local governments may go further2
Applies to
All counties and cities2
Local amendments allowed?
Only with State Building Code Council approval2
Amendments
Chapter 51-51 WAC1
Next edition (not yet in force)
2024 edition planned; implementation date Monday, May 3, 2027 (schedule, not yet adopted)6

International Existing Building Code (IEBC)

Scope
Statewide minimum; local governments may go further2
Applies to
All counties and cities2
Local amendments allowed?
Yes not below state minimum; residential amendments need SBCC approval2
Amendments
Chapter 51-50 WAC, sections 51-50-480000 to 51-50-48xxxx1
Next edition (not yet in force)
2024 edition planned; implementation date Monday, May 3, 2027 (schedule, not yet adopted)6

International Mechanical Code (IMC)

Scope
Statewide minimum; local governments may go further2
Applies to
All counties and cities2
Local amendments allowed?
Yes not below state minimum; residential amendments need SBCC approval2
Amendments
Chapter 51-52 WAC1
Next edition (not yet in force)
2024 edition planned; implementation date Monday, May 3, 2027 (schedule, not yet adopted)6

International Fuel Gas Code (IFGC)

Scope
Statewide minimum; local governments may go further2
Applies to
All counties and cities2
Local amendments allowed?
Yes not below state minimum; residential amendments need SBCC approval2
Amendments
Chapter 51-52 WAC (sections 51-52-21000 and following)1
Next edition (not yet in force)
2024 edition planned; implementation date Monday, May 3, 2027 (schedule, not yet adopted)6

International Fire Code (IFC)

Scope
Statewide minimum; local governments may go further2
Applies to
All counties and cities2
Local amendments allowed?
Yes not below state minimum; residential amendments need SBCC approval2
Amendments
Chapter 51-54A WAC1
Next edition (not yet in force)
2024 edition planned; implementation date Monday, May 3, 2027 (schedule, not yet adopted)6

Uniform Plumbing Code (UPC)

Scope
Statewide minimum; local governments may go further2
Applies to
All counties and cities2
Local amendments allowed?
Yes not below state minimum; residential amendments need SBCC approval2
Amendments
Chapter 51-56 WAC1
Next edition (not yet in force)
2024 edition planned; implementation date Monday, May 3, 2027 (schedule, not yet adopted)6

Energy code, residential

Scope
Statewide; applies everywhere1
Applies to
Residential buildings in every town, city and county1
Local amendments allowed?
No (maximum and minimum code)1
Amendments
Chapter 51-11R WAC1
Next edition (not yet in force)
2024 edition planned; implementation date Monday, May 3, 2027 (schedule, not yet adopted)6

Energy code, commercial

Applies to
Commercial buildings1
Amendments
Chapter 51-11C WAC1
Next edition (not yet in force)
2024 edition planned; implementation date Monday, May 3, 2027 (schedule, not yet adopted)6

National Electrical Code (NEC)

Applies to
Statewide; L&I permits and inspects except in cities with their own electrical program and Tacoma Power's service area4
Amendments
Chapter 296-46B WAC1
Transition period
Code edition follows electrical permit issue date; new dwellings follow building permit issue date1
Next edition (not yet in force)
2026 NEC effective December 31, 20261

Wildland-Urban Interface Code (IWUIC)

Scope
Adopted locally2
Applies to
Counties, cities and towns that adopt it5
Amendments
Chapter 51-55 WAC (reserved)5

How Washington adopts building codes

RCW 19.27.031, 19.27.040, 19.27.050, 19.27.060, 19.27.074, 19.27.090

  • Statewide state building code in effect in all counties and cities. Except as otherwise provided in this chapter, there shall be in effect in all counties and cities the state building code which shall consist of the following model codes which are hereby adopted by reference…2
  • Model codes: IBC, IRC, IMC, IFC, limited IWUIC, UPC. (a)(i) The International Building Code, published by the International Code Council, Inc.2
  • Three-year adoption cycle. (3)(a) The model codes enumerated in this section shall be adopted or amended by the council as provided in RCW 19.27.074 and 19.27.032 through 19.27.034 in a three-year state building code adoption cycle.2
  • Council action within 30 months of model code publication. (b) The council shall review the most recent editions of each of the model codes enumerated in subsection (1) of this section and take action on adoption no later than 30 months after the date of publication of each such code.2
  • Cycle decisions before December 1, effective after next regular legislative session. (c) All decisions to adopt or amend codes of statewide application through a three-year code adoption cycle shall be made prior to December 1st of any year and shall not take effect before the end of the regular legislative session in the next year.2
  • State Building Code Council adopts and maintains the codes. (a) Adopt and maintain the codes to which reference is made in RCW 19.27.031 in a status which is consistent with the state's interest as set forth in RCW 19.27.020.2
  • Council sits in the Department of Enterprise Services. There is hereby established in the department of enterprise services a state building code council, to be appointed by the governor.2
  • Counties and cities enforce the code. The state building code required by this chapter shall be enforced by the counties and cities.2
  • Local amendments allowed, may not diminish minimum standards. The governing body of each county or city is authorized to amend the state building code as it applies within the jurisdiction of the county or city. The minimum performance standards of the codes and the objectives enumerated in RCW 19.27.020 shall not be diminished by any county or city amendments.2
  • Residential amendments need council approval. (a) Except as provided in subsection (2) of this section, no amendment to a code enumerated in RCW 19.27.031 as amended and adopted by the state building code council that affects single-family or multifamily residential buildings shall be effective unless the amendment is approved by the building code council under RCW 19.27.074(1)(b).2
  • Zoning, setbacks, snow and wind loads reserved to local jurisdictions. Local land use and zoning requirements, building setbacks, side and rear-yard requirements, site development, property line requirements, requirements adopted by counties or cities pursuant to chapter 58.17 RCW, snow load requirements, wind load requirements, and local fire zones are specifically reserved to local jurisdictions notwithstanding any other provision of this chapter.2
  • Permit application vests under code in effect at application. (1) A valid and fully complete building permit application for a structure, that is permitted under the zoning or other land use control ordinances in effect on the date of the application shall be considered under the building permit ordinance in effect at the time of application, and the zoning or other land use control ordinances in effect on the date of application.2
  • International Residential Code (chapter 51-51 WAC) effective in all counties and cities on March 15, 2024. The International Residential Code adopted by chapter 51-51 WAC shall become effective in all counties and cities of this state on March 15, 2024.1
  • 2024 edition planned; implementation date Monday, May 3, 2027 (schedule, not yet adopted). Implementation Date Monday, May 3, 2027…6
  • Electrical code adopted separately by L&I (2023 NEC). The 2023 edition of the National Electrical Code (NFPA 70 - 2023) including Annex A, B, C, and subsequent Errata and Tentative Interim Amendments issued by the National Fire Protection Association…1
Applies to
All counties and cities2
Can local rules be stricter?
The governing body of each county or city is authorized to amend the state building code as it applies within the jurisdiction of the county or city. The minimum performance standards of the codes and the objectives enumerated in RCW 19.27.020 shall not be diminished by any county or city amendments.2

Residential code in Washington cities

The edition each city enforces, from the city’s own adoption page or ordinance.

CityResidential codeEffective
Seattle2021 IRC78

For permits, exemptions and owner-builder rules, see Washington building permits. To compare editions across states, see the code adoption map.

Sources

  1. WAC 51-51-003 International Residential CodeWashington State Legislature, Washington Administrative Code (State Building Code Council rules)Effective March 16, 2024Checked November 6, 2026
  2. Chapter 19.27 RCW, State Building CodeWashington State Legislature, Revised Code of WashingtonChecked November 7, 2026
  3. WSR 24-05-085 Permanent Rules, Department of Labor and IndustriesWashington State Legislature, Office of the Code Reviser (Washington State Register)Published February 21, 2024Checked November 6, 2026
  4. Electrical Permits, Fees & InspectionsWashington State Department of Labor & IndustriesChecked November 7, 2026
  5. 2024 Code Adoption Cycle | SBCCWashington State Building Code Council (Department of Enterprise Services)Checked November 6, 2026
  6. Remaining 2024 Code Adoption Cycle ScheduleWashington State Building Code Council (Department of Enterprise Services)Revised August 14, 2026Checked November 6, 2026
  7. Residential Code - Construction and InspectionsCity of Seattle, Seattle Department of Construction & InspectionsChecked November 6, 2026
  8. 2021 Seattle Code Adoption - TimelineCity of Seattle, Seattle Department of Construction & InspectionsChecked November 6, 2026